My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MADRID & ASSOCIATES - 2011
Clerk
>
Contracts / Agreements
>
M
>
MADRID & ASSOCIATES - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2014 4:39:48 PM
Creation date
1/19/2012 3:10:34 PM
Metadata
Fields
Template:
Contracts
Company Name
MADRID & ASSOCIATES
Contract #
N-2011-155
Agency
COMMUNITY DEVELOPMENT
Insurance Exp Date
5/12/2012
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMENTS <br />Project Name: CHRISTIAN MENS CENTER Site Visit Date 2/5/�O <br />PROJECT TEAM <br />Owner: DWC - Joe Alts (Site Director) <br />DWC's Construction Manager: Larry Redman (Trucon) <br />Contractor Barker Construction <br />Project Managers : Kathy Gram / Andre Best / Jim Surdy <br />Site Superintendent: Ray Franks <br />Lenders: LAHD : Glen Lima <br />LACDC : Steve Chawla <br />CRA : Mary Stein <br />OBSERVAT I <br />ONS <br />Project continues to progress on schedule with the contractual completion date. No significant issues <br />identified at this time. <br />INTER /OR /MPROVEMENTS <br />Ground Floor- Production interior wall framing is near completion. Last of overhead electrical <br />conduit installation is in progress. Main overhead fire sprinkler lines are installed. Preliminary drywall <br />hanging has started. Rough electrical wiring is underway. Electrical main switchgear is set in place <br />(partial). <br />Garden Level - Placement of concrete floor slab is scheduled for this week. Construction and <br />waterproofing of masonry block planters is completed. New facade material will be applied at <br />completion of concrete slab. Metal storefront window /door frames are set in place (no glass). <br />Second Floor - Production drywall installation is completed and currently undergoing wall painting. <br />Office metal door frames installation is in progress. <br />Mezzanine Level - Building's mechanical air handlers are installed. Interior perimeter steel stud wall <br />framing and drywall installation is completed (southern wall). This level is currently being utilized as a <br />construction material storage area. <br />Third Floor - <br />AII rough trade inspections are approved. Preliminary drywall installation is completed. Wall <br />insulation is completed. Production drywall hanging is underway. <br />Fourth Floor - <br />Partition wall framing is completed with the majority of rough MEPS systems installed and inspected <br />(Mechanical, Electrical, Plumbing & Fire Sprinklers). Preliminary drywall installation is completed. <br />Production drywall hanging is scheduled to start this week. <br />Fifth Floor - <br />Partition wall framing is completed with rough MEPS systems installed and inspected (Mechanical, <br />Electrical, Plumbing & Fire Sprinklers). Preliminary drywall installation is completed. Production <br />drywall hanging is scheduled to start this week. <br />Sixth Floor - Installation of ceiling mounted plumbing lines and mechanical heating ducts are <br />completed. Partition wall framing is completed. Preliminary drywall installation is completed. Rough <br />MEPS installations are in the latter stage of completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.