Laserfiche WebLink
EXHIBIT B <br />FEE SCHEDULE <br />I. ENERGY AND SUSTAINABILITY CONSULTING RATES <br />CONSULTANT <br />Principal in Charge <br />Analyst <br />II. TASKS — PHASE I <br />HOURLY <br />RATES * <br />$155.00 <br />$ 60.00 <br />Task 2A: Oversee preparation and implementation of a Municipal Operations and Community - <br />wide baseline Green House Gas Inventory to be developed by a separately contracted technical <br />consultant. Deliverables will include: <br />• Report on Status of contractor to perform the task. <br />• Coordinate assessment and planning report for conducting the baseline Green House Gas <br />Inventory including the energy savings analysis for the baseline GHG Inventory. <br />• Coordinate and disseminate draft report on the results of the GHG Inventory including <br />the energy savings analysis of the baseline GHG. <br />• Coordinate and disseminate final report on the results of the GHG Inventory including <br />the energy savings analysis of the baseline GHG. <br />• Report on dissemination of the baseline GHG Inventory including the energy savings <br />analysis of the baseline GHG. <br />• File monthly status reports as required by City, SCE and /or CPUC. <br />Task 2B: Oversee preparation and development of Citywide Climate Action Plan to be <br />developed by a separately contracted technical consultant. Deliverables will include: <br />• Coordinate and oversee Assessment and Planning Report for the development of a <br />Citywide Climate Action Plan. <br />• Coordinate and oversee draft Climate Action Plan pursuant to Council timeframe and <br />direction between September 2011 and November 2012. <br />• Coordinate, oversee and report on stakeholder input pursuant to Council timeframe and <br />direction between September 2011 and November 2012. <br />• Coordinate and oversee Final Climate Action Plan pursuant to Council timeframe and <br />direction between September 2011 and November 2012. <br />• Coordinate and oversee monitoring framework for Climate Action Plan. <br />• File monthly status reports from September 2011 through November, 2012 as required by <br />City, SCE and /or CPUC. <br />Task 3: Coordinate California Green Building Code and LEED Certification Training. <br />Deliverables will include: <br />• Coordinate assessment and planning report on California Green Building Code and <br />LEED Certification Training. <br />• Develop quarterly training schedule. <br />• Coordinate, oversee and report on stakeholder input. <br />• Report on best practices and lessons learned <br />12 <br />