My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REDFLEX TRAFFIC SYSTEMS 1 - 2002
Clerk
>
Contracts / Agreements
>
R
>
REDFLEX AGMTS (as of 2-9-12)
>
REDFLEX TRAFFIC SYSTEMS 1 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2019 3:28:25 PM
Creation date
2/9/2012 9:27:43 AM
Metadata
Fields
Template:
Contracts
Company Name
Redflex Traffic Systems
Contract #
A-2002-231
Agency
Police
Council Approval Date
12/2/2002
Expiration Date
12/2/2007
Insurance Exp Date
4/1/2015
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1*00 '"W <br />to a Violation being deemed to have occurred, and the location(s) in an intersection which a <br />motor vehicle must pass during a red light signal prior to being deemed to have committed a <br />Violation, all of which shall be in compliance with all applicable laws, rules and regulations of <br />governmental authorities. <br />U. "SmartCamTM System" means the proprietary digital speed and redlight photo <br />enforcement system of Redflex relating to the Redlight Photo Enforcement Program. <br />V. "SmartOpsTM System" means the proprietary back - office processes of Redflex <br />relating to the Redlight Photo Enforcement Program. <br />W. "Traffic Signal Controller Boxes" means the signal controller interface and <br />detector, including but not limited to the radar or video loop, as the case may be. <br />X. "Violation" means a traffic violation contrary to the terms of the California <br />Vehicle Code Section 21453, failing to stop for a red light. <br />Y. "Violations Data" means the images and other Violations data gathered by the <br />Redflex System at the Designated Intersection Approaches. <br />Z. "Warning Period' eriod' means the period of thirty (30) days after the Installation Date <br />of the first intersection approach. <br />3. INSTALLATION. Contractor shall install up to twenty (20) Redflex Systems at <br />Designated Intersection Approaches; actual number of systems implemented and <br />implementation schedule will be based on mutual agreement between the City of Santa Ana and <br />Redflex Traffic Systems and will be based on safety expectations, traffic volume and flows, etc. <br />Each Redflex System will operate on a 24 -hour basis across up to four lanes of width per <br />approach. These system units will be installed and become operational as follows (tentative <br />schedule, which is based on mutual agreement): <br />a. At least two (2) single approaches shall be operational by March 1, 2003. <br />At least ten (10) additional single approaches shall be operational by June 1, <br />2003. <br />The remaining eight (8) single approaches shall be operational by August 1, 2003. <br />b. If installation dates are not met within the time frame set forth above, the City has <br />the right, but not the obligation to terminate this Agreement; or renegotiate the terms of the this <br />Agreement; or reduce the number of Redflex Systems to be installed. <br />C. Designated Intersection Approaches shall be chosen by the City's Representative <br />and be reasonably acceptable to Contractor. <br />d. Contractor will be responsible for obtaining all required permits, licenses, and <br />insurance required for installation. <br />e. The Contractor shall be responsible for coordination of any necessary electrical <br />F1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.