My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20120123_2012-01_1301EWarner
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2012
>
20120123_2012-01_1301EWarner
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 10:58:32 AM
Creation date
2/15/2012 4:06:54 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP 2011-25
Date
1/23/2012
Notes
1301EWarner
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Conditions for Approval for Conditional Use Permit No. 2011-25 <br />Conditional Use Permit No. 2011-25 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the California Building Standards <br />Code and all other applicable regulations. <br />The applicant must comply in full with each and every condition listed belowrip or to <br />exercising the rights conferred by this conditional use permit. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />A. Planning Division <br />1. The applicant must comply with all conditions and requirements of the <br />Resolution No. 2012-01 <br />Pape 4 of 6 <br />Development Review Committee for the development project (DP No. <br />2011-8). <br />2. Any amendment to this conditional use permit must be submitted to the <br />Planning Division for review. At that time, staff will determine if <br />administrative relief is available or the conditional use permit must be <br />• <br />amended. <br />3. The proposed monopole shall be constructed as per approved plans and <br />any existing landscaping shall be protected in place during the construction <br />period for the 60 -foot tower facility. <br />4. The proposed monopole shall be constructed per the following <br />specifications: <br />a. The monopine should have 3.1 branches per foot for full density <br />coverage with limited spacing between the branches; 70 percent of <br />the branches should be eight feet or longer. <br />b. Branch disbursement should be random so that longer branches and <br />shorter branches are intermingled to give a natural appearance. <br />C. Branches should exceed all antennas by a minimum of 12 inches. <br />d. Branches should start at 15 feet above the ground. <br />e. There should be a minimum space of seven feet between the top of <br />the antenna and the top of the branches. <br />f. Branches should have a sweep similar to that of an actual <br />Eucalyptus Tree. <br />g. Branch foliage color should be an olive green with some other <br />appropriate coloring to match an actual Eucalyptus Tree. A sample <br />• <br />shall be submitted for approval prior to fabrication. <br />Resolution No. 2012-01 <br />Pape 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.