My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
02/21/2012
>
55A - SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 3:49:20 PM
Creation date
2/16/2012 11:13:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
2/21/2012
Destruction Year
2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 2 CEQA Findings Attachment "A" <br />2.2 Findings Regarding Environmental Impacts <br />Table 2 -1, CEQA Findings, summarizes the environmental impacts of the Project which either have <br />no impact or are less than significant, the significant impacts of the Project that will be reduced to <br />less - than - significant levels with mitigation, and the significant and unavoidable impact. <br />The City hereby finds that Project impacts associated with the issue areas of Hazards/Hazardous <br />Materials, Utilities /Service Systems, and Water Quality /Hydrology either have no impact or are less <br />than significant. This finding is based on the explanation and analysis included in RDEIR Chapters <br />3.2, 3.5 and 3.6, respectively, which the City ratifies, adopts and incorporates in these findings. <br />The City hereby finds that mitigation measures have been identified in the RDEIR that will avoid or <br />substantially lessen Project impacts associated with the issue areas of Air Quality, Noise, and <br />Transportation and Traffic to a less than significant level. This finding is based on the explanation <br />and analysis included in RDEIR Chapters 3.1, 3.3 and 3.4, respectively, which the City ratifies, <br />adopts and incorporates in these findings. <br />The City hereby finds that mitigation measures have been identified in the RDEIR that will lessen <br />Project impacts associated with the issue areas of Transportation and Traffic, specifically the impact <br />to intersection operations during implementation of Construction Configuration C.2 under <br />Transportation /Traffic Threshold 1, but not to a less than significant level. This finding is based on <br />the explanation and analysis included in RDEIR Chapter 3.4, which the City ratifies, adopts and <br />incorporates in these findings. <br />In addition, the City hereby finds that impacts to the following issue areas would not occur as a result <br />of the Proposed Project: Aesthetics; Agricultural Resources; Biological Resources; Cultural <br />Resources; Geology /Soils; Land Use /Planning; Mineral Resources; Population /Housing; Public <br />Services; Recreation; and Utilities /Service Systems (except for wastewater). This finding is based on <br />the explanation and analysis included in Initial Study prepared for the Project, which the City ratifies, <br />adopts and incorporates in these findings. <br />Additional facts that support the findings are set forth in the Final EIR, the staff report to the City <br />Council, and the record of proceedings for the Project. Key discussions that support the Findings <br />from the Final EIR are summarized in the "Evidence /Rationale Supporting Finding" column of Table <br />2 -1. However, other evidence may be contained in the overall record of the project to further support <br />the finding. In making these findings, the City ratifies, adopts and incorporates the analysis and <br />explanation in the Final EIR, and ratifies, adopts and incorporates in these findings the <br />determinations and conclusions of the Final EIR relating to the environmental impacts and mitigation <br />measures, except to the extent any such determinations or conclusions are specifically and expressly <br />modified by these findings. <br />The documents and other materials that constitute the record of proceedings on which the Project <br />findings are based are located at the City of Santa Ana Public Works Agency, 200 South Daisy <br />Avenue, Corporate Yard, MS 85, Santa Ana, California, 92703. The custodian for these documents <br />is Steve Worrall, Senior Civil Engineer. This information is provided in compliance with Public <br />Resources Code §21081.6(a)(2) and CEQA Guidelines §15091(e). <br />San Lorenzo Lift Station EIR (Project No. 06 -3510) 2 -2 <br />Findings of Fact /Statement of Overriding Considerations <br />55A -16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.