My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-02-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
02/21/2012
>
FULL PACKET_2012-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 3:43:24 PM
Creation date
2/27/2012 1:04:26 PM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
2/21/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
642
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. Full bark cladding with a custom color should be submitted for <br />approval prior to fabrication. <br />i. All antennas shall be covered with "antenna socks" that match the <br />approved foliage color. <br />j. All "stand -off mounts" and support pipe mounts shall be concealed <br />behind antennas and painted a darker shade or green (or black) with <br />a "flat" paint finish to reduce reflection and visibility of the mounting. <br />k. Include the tree specifications (selected manufacturers and models) <br />with photo simulations (also a site plan review requirement). <br />I. Show the location of the GPS antenna on all elevations. <br />M. Provide a "unistrut" detail for the utility cabinet; an "H- frame" is not <br />acceptable. <br />n. Provide a note on the plans stating "install underground utilities <br />sleeving for two carriers during construction of the structure ". <br />Shrouds on the outside of the pole are not acceptable. <br />o. All exterior conduit and electrical meters shall be installed and <br />screened in one metal enclosure painted to match the structure. <br />5. The permit applicant shall provide a 24 -hour phone number to which <br />interference problems may be reported. This condition will also apply to all <br />existing facilities in the City of Santa Ana. <br />6. The permit applicant will provide a "single point of contact" in its <br />Engineering and Maintenance Departments to insure continuity on all <br />interference issues. The name, telephone number, fax number and e-mail <br />address of that person shall be provided to the City's designated <br />representative upon activation of the facility. <br />7. The permit applicant shall insure that lessee or other user(s) shall comply <br />with the terms and conditions of this permit, and shall be responsible for the <br />failure of any lessee or other users under the control of permit applicant to <br />comply. <br />8. The permit applicant shall provide a coverage and cell site location map for <br />each existing and proposed facility in Santa Ana. <br />9. Locate all equipment and related appurtenances (appleton plug and electric <br />meter) on the inside of the existing equipment enclosure or inside the <br />building and underground all electrical power from the utility source shown <br />on the approved site plan. <br />10. Locate all proposed ladders on the interior of the building or inside the lease <br />area within the building. <br />Resolution No. 2012 -01 <br />Page 5 of 6 <br />31 B -25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.