My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-02-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
02/21/2012
>
FULL PACKET_2012-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 3:43:24 PM
Creation date
2/27/2012 1:04:26 PM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
2/21/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
642
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. INTRODUCTION <br />The City of Santa Ana is requesting proposals from planning and environmental consulting <br />firms for preparation of a mitigated negative declaration for an expansion and master plan for <br />Calvary Church of Santa Ana at 1010 North Tustin Avenue, Santa Ana. The scope of work <br />may include any and all work efforts related to the analysis, preparation, community outreach <br />and related compliance with CEQA. This will include the preparation of a mitigated negative <br />declaration (or environmental impact report if required) and required technical studies, on- <br />call consulting on as needed basis, and attendance at public hearings. <br />11. PROJECT DESCRIPTION <br />Calvary Church of Santa Ana has submitted a proposal to the City for a new master plan for <br />their existing campus. The master plan includes the demolition of three existing buildings <br />(17,700 square feet), the partial demolition of a classroom building and chapel <br />(approximately 8,000 square feet), and the construction of a Student Life Center (10,800 <br />square feet), Community Life Center (9,500 square feet) and Children's Ministry Center <br />(12,700 square feet). Other improvements include tenant improvements to existing buildings <br />and the installation of new landscaping on the campus. A total of 1,053 parking spaces are <br />required for this site while 587 are located on -site. The church has off -site agreements with <br />neighboring properties for an additional 446 stalls. <br />Discretionary actions required for the project include a zone change to a specific <br />development (SD) zoning designation and site plan review approval by the Planning <br />Commission. <br />Staff has been authorized by the City Council to distribute this Request for Proposals for <br />environmental services to prepare the necessary environmental document. The <br />recommended contract will be submitted for City Council authorization after review of the <br />proposal has been completed. <br />III. GENERAL INFORMATION <br />The term of the consultant will begin when the contract is approved by the City Council. <br />A. When appropriate, the City will furnish information in its possession relevant to <br />preparation of the environmental documentation, including the General Plan and Zoning <br />information. <br />B. The Consultant shall be responsible for retaining data, records and documentation for the <br />preparation of the environmental document. These materials shall be made available to <br />the City upon acceptance of the final draft text or at any earlier time at the request of the <br />City. <br />C. In an effort to promote the hiring and utilization of local businesses /merchants, when <br />selecting a consultant to perform the tasks identified in the following sections, local <br />companies shall be given preference. <br />K <br />19E -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.