My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-02-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
02/21/2012
>
FULL PACKET_2012-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 3:43:24 PM
Creation date
2/27/2012 1:04:26 PM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
2/21/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
642
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
➢ Tustin Avenue between Fourth Street and Seventeenth Street <br />➢ Fourth Street between 1 -5, NB Ramps and 1 -55 SB Ramps <br />➢ Any additional segment as necessitated by the assessment of neighborhood traffic. <br />• Analysis of delivery trucks accessibility, their impact upon the street bordering the site and <br />recommendations to mitigate said impacts. <br />• Internal circulation, particularly with respect to vehicular queues at driveways, required <br />stacking distance and potential impacts upon on- street traffic. <br />• The project scenario analysis must include a scenario that isolates project impacts. <br />• Specific intersection control analysis at all unsignalized intersections. Please note that this is <br />not a request to install a traffic signal. <br />• An assessment and recommendations of existing and future geometric /striping of all end - <br />block locations presented above. <br />• The study must include detailed assessment of potential impacts on the adjacent residential <br />component. Recommendations to minimize or eliminate impacts must be clearly identified. <br />• Meet with City staff to verify /determine other concerns and issues relative to the <br />development of the project. Discuss the key intersections to be analyzed, obtain traffic count <br />information and background data either available in City files of contained in other traffic <br />reports for the area. <br />• Field inspect the subject roadway areas and inventory the existing street system as to base <br />line width, striping patterns, and traffic. <br />• Collect traffic counts on key site area roadways and intersections. These counts will include <br />morning and afternoon peak hour turning movements as well as 24 -hour daily volumes at <br />locations between selected intersections. <br />• Study shall include scenario analysis as follow: <br />➢ Existing Conditions — utilized to establish the current level or existing baseline of <br />traffic operations. <br />➢ 2015 Project Opening Year No Project Conditions — establishes project opening year <br />baseline to evaluate the proposed Project. <br />➢ 2015 Project Opening Year with Project Conditions — represents project opening year <br />baseline traffic conditions. <br />➢ 2035 Project Design Year No Project Conditions — establishes future year baseline to <br />evaluate the proposed Project. <br />➢ 2035 Project Design Year with Project Conditions — represents future year baseline <br />traffic conditions with the proposed Project. <br />NOTE: for the purposes of this analysis, the Metro East Overlay shall be used. City staff will <br />provide information. <br />In <br />19E -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.