Laserfiche WebLink
➢ Tustin Avenue between Fourth Street and Seventeenth Street <br />➢ Fourth Street between 1 -5, NB Ramps and 1 -55 SB Ramps <br />➢ Any additional segment as necessitated by the assessment of neighborhood traffic. <br />• Analysis of delivery trucks accessibility, their impact upon the street bordering the site and <br />recommendations to mitigate said impacts. <br />• Internal circulation, particularly with respect to vehicular queues at driveways, required <br />stacking distance and potential impacts upon on- street traffic. <br />• The project scenario analysis must include a scenario that isolates project impacts. <br />• Specific intersection control analysis at all unsignalized intersections. Please note that this is <br />not a request to install a traffic signal. <br />• An assessment and recommendations of existing and future geometric /striping of all end - <br />block locations presented above. <br />• The study must include detailed assessment of potential impacts on the adjacent residential <br />component. Recommendations to minimize or eliminate impacts must be clearly identified. <br />• Meet with City staff to verify /determine other concerns and issues relative to the <br />development of the project. Discuss the key intersections to be analyzed, obtain traffic count <br />information and background data either available in City files of contained in other traffic <br />reports for the area. <br />• Field inspect the subject roadway areas and inventory the existing street system as to base <br />line width, striping patterns, and traffic. <br />• Collect traffic counts on key site area roadways and intersections. These counts will include <br />morning and afternoon peak hour turning movements as well as 24 -hour daily volumes at <br />locations between selected intersections. <br />• Study shall include scenario analysis as follow: <br />➢ Existing Conditions — utilized to establish the current level or existing baseline of <br />traffic operations. <br />➢ 2015 Project Opening Year No Project Conditions — establishes project opening year <br />baseline to evaluate the proposed Project. <br />➢ 2015 Project Opening Year with Project Conditions — represents project opening year <br />baseline traffic conditions. <br />➢ 2035 Project Design Year No Project Conditions — establishes future year baseline to <br />evaluate the proposed Project. <br />➢ 2035 Project Design Year with Project Conditions — represents future year baseline <br />traffic conditions with the proposed Project. <br />NOTE: for the purposes of this analysis, the Metro East Overlay shall be used. City staff will <br />provide information. <br />In <br />19E -12 <br />