Laserfiche WebLink
EIR Process <br />� Environmental Impact Report (EIR) was prepared for the San <br />Lorenzo Sewer Lift Station in 2010 <br />J EIR was circulated for Public Review and Comment from July <br />14th through September 10t ", 2010 (58 days) <br />EIR was originally scheduled for the City Council meeting of <br />February 7th, 2011; however, the item was pulled to address a <br />number of last minute comments received the afternoon of the <br />City Council meeting <br />The City chose to expand the EIR's analysis of alternatives for <br />the proposed project and incorporate other minor revisions into <br />the document <br />A Draft EIR was prepared and re- circulated for public review <br />from September 14th through October 31St, 2011 <br />The re- circulated EIR evaluated 21 alternatives to the proposed <br />project, including 19 alternative site locations <br />