My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HANDOUT_55A_FINAL SAN LORENZO LIFT STATION_BLACK AND WHITE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
02/21/2012
>
HANDOUT_55A_FINAL SAN LORENZO LIFT STATION_BLACK AND WHITE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 3:49:55 PM
Creation date
2/27/2012 2:00:07 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIR Process <br />� Environmental Impact Report (EIR) was prepared for the San <br />Lorenzo Sewer Lift Station in 2010 <br />J EIR was circulated for Public Review and Comment from July <br />14th through September 10t ", 2010 (58 days) <br />EIR was originally scheduled for the City Council meeting of <br />February 7th, 2011; however, the item was pulled to address a <br />number of last minute comments received the afternoon of the <br />City Council meeting <br />The City chose to expand the EIR's analysis of alternatives for <br />the proposed project and incorporate other minor revisions into <br />the document <br />A Draft EIR was prepared and re- circulated for public review <br />from September 14th through October 31St, 2011 <br />The re- circulated EIR evaluated 21 alternatives to the proposed <br />project, including 19 alternative site locations <br />
The URL can be used to link to this page
Your browser does not support the video tag.