My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-001 - Statement of Overriding Considerations, and Adopting a Mitigation Monitoring and Reporting Program
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2012
>
2012-001 - Statement of Overriding Considerations, and Adopting a Mitigation Monitoring and Reporting Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2012 3:02:32 PM
Creation date
2/28/2012 2:56:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Date
2/21/2012
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project AifematAss Attachment "A" <br />• 3.4.14.2 Summary ComDari <br />son of Environmental Effects <br />The environmental effects of constructing the proposed lift station at Alternative Site No. 12 in <br />comparison to the proposed Project site are shown in Final EIR Table 5-1 and described in detail in <br />RDEIR Section 5.4.14. Alternative Site No. 12 would avoid the proposed Project's significant and <br />unavoidable impact associated with Construction Configuration C.2; however, this alternative would <br />create a significant and immitigable near-term impact to transportation/traffic due to a LOS <br />deficiency that would occur for approximately twenty-two (22) days during construction, which is a <br />slight decrease in duration as compared to the twenty-five (25) days of construction during which the <br />proposed Project would create a significant unavoidable impact to transportation/traffic at the South <br />Bristol Street/West Segerstrom Avenue intersection. Impacts to transportation/traffic would also <br />occur when construction activities disrupt left-turn movements, thereby diverting traffic to adjacent <br />intersections or encouraging cut-through traffic in local neighborhoods; such impacts would not <br />occur in association with the proposed Project and would represent a new significant and <br />unavoidable impact to traffic/transportation. Furthermore, construction of a lift station at Alternative <br />Site No. 12 would exacerbate an existing parking deficiency at an existing medical complex both <br />during construction and long-term operation. Near- and long-term impacts to parking at Alternative <br />Site No. 12 would be a significant and unmitigable impact. Since this alternative would significantly <br />impact traffic along South Bristol Street and would significantly impact parking, impacts to <br />transportation/traffic would be greater at Alternative Site No. 12 as compared to the proposed Project <br />site. <br />Total construction air quality/greenhouse gas emissions would be slightly reduced under this <br />• alternative due to a slightly reduced construction period, although average daily construction <br />emissions would be similar to the proposed Project and would not be significant. Near-term <br />nighttime construction noise and long-term odor impacts are assumed to be slightly reduced under <br />this alternative, but as with the proposed Project these effects would be reduced to less than <br />significant levels with incorporation of mitigation. Impacts related to near-term water quality and <br />hydrology also would be slightly decreased under this alternative due to a smaller area of impact, <br />although as with the proposed Project such impacts would be less than significant. Impacts related to <br />operational noise, utilities and service systems, and water quality and hydrology (long-term) would <br />be similar to the proposed Project and would be less than significant. <br />3.4.14.3 Finding and Rationale for Alternative Site No 12 <br />The City hereby finds that specific economic, legal, social, technological, or other considerations <br />make Alternative Site No. 12 infeasible. <br />Alternative Site No. 12 would result in an overall increase in impacts to transportation/traffic as <br />compared to the proposed Project. Although this alternative would avoid the proposed Project's <br />significant and unavoidable impact to the south Bristol Street/West Segerstrom Avenue during the <br />five weeks in which Construction Configuration C.2 would be in place, this alternative would result <br />in a LOS deficiency that would occur for approximately 22 days during construction, would result in <br />new significant unavoidable impacts due to the disruption of left-turn movements along South Bristol <br />Street, and also would result in a new significant and unavoidable impact to parking (near- and long- <br />term). Impacts to parking and turn movements would not occur in association with the proposed <br />Project. In light of these considerations, the City finds that Alternative Site No. 12 would result in an <br />overall increase in near-term impacts to transportation/traffic, and rejects this alternative as infeasible <br />• <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 3-28 <br />CEQA Findings of Fact/Statement of Overriding Considerations
The URL can be used to link to this page
Your browser does not support the video tag.