Chapter 3 Findings Regarding Project ABematAss Attachment 'A' <br />• feet, and this depth would increase with distance from the existing facility. Construction along this <br />segment of South Bristol Street would require supporting the utilities from the top of the trench <br />and/or the use of trench boxes/shields, which would elongate the construction schedule. Due to these <br />existing utility constraints beneath South Bristol Street, portions of this roadway would need to be <br />closed to accommodate construction associated with this alternative, which has the potential to result <br />in adverse effects to vehicular circulation. Implementation of this alternative would otherwise be <br />similar to the proposed Project during construction conditions. <br />Development of a lift station at Alternative Site No. 15 also would require the City to acquire private <br />property to implement a temporary construction easement, accommodate the proposed lift station, <br />and provide easements for proposed sewer lines. <br />3.4.17.2 Summary Comparison of Environmental Effects <br />The environmental effects of constructing the proposed lift station at Alternative Site No. 15 in <br />comparison to the proposed Project site are shown in Final EIR Table 5-1 and described in detail in <br />RDEIR Section 5.4.17. This alternative would avoid the Project's significant and unavoidable <br />impact associated with Construction Configuration C.2; however, this alternative would create a <br />significant and unmitigable near-term impact to transportation/traffic due to a LOS deficiency that <br />would occur for approximately 90 days during construction, which is an increase in duration as <br />compared to the twenty-five (25) days of construction during which the proposed Project would <br />create a significant unavoidable impact to transportation/traffic at the South Bristol Street/West <br />Segerstrom Avenue intersection. Impacts to transportation/traffic would also occur when <br />construction activities disrupt left-turn movements, thereby diverting traffic to adjacent intersections <br />• or encouraging cut-through traffic in local neighborhoods; such impacts would not occur in <br />association with the proposed Project. As such, impacts to transportation/traffic would be greater at <br />Alternative Site No. 14 as compared to the proposed Project site, and mitigation would not be <br />available to reduce these effects to less than significant levels, as there is no way to construct this <br />alternative without affecting the travel lanes within South Bristol Street, and because there is no way <br />to avoid affecting left turns along South Bristol Street during construction. <br />Total construction air quality/greenhouse gas emissions would be increased under this alternative due <br />to a longer construction period, although average daily construction emissions would be similar to <br />the proposed Project and would be less than significant. In addition, construction-related impacts to <br />water quality and hydrology would be increased under this alternative due to an increased area of <br />impact, although such impacts would be less than significant. Long-term odor impacts associated <br />with accident conditions and near-term noise impacts associated with nighttime dewatering activities <br />would be slightly decreased under this alternative, due to the increased distance to nearby sensitive <br />receptors, although as with the proposed Project such impacts would be less than significant due to <br />implementation of Mitigation Measures MM 3.3-1 and 3.3-2. Impacts related to noise, utilities and <br />service systems, and water quality and hydrology (long-term) would be similar to the proposed <br />Project and would be less than significant. <br />3.4.17.3 Finding and Rationale for Alternative Site No 15 <br />The City hereby finds that specific economic, legal, social, technological, or other considerations <br />make Alternative Site No. 15 infeasible. <br />• <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 3-34 <br />CEQA Findings of Fact/Statement of Overriding Considerations