Laserfiche WebLink
Chapter 3 Findings Regarding ProjectAilemathees Attachment W <br />8. The Project will provide all of the benefits listed above at a small, vacant, undeveloped <br />property through which the City has an existing sewer easement, and in close proximity to <br />the existing Lift Station, which minimizes the length of new sewer main required. <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 4-49 <br />CEQA Findings of Fact/Statement of Overriding Considerations