My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-001 - Statement of Overriding Considerations, and Adopting a Mitigation Monitoring and Reporting Program
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2012
>
2012-001 - Statement of Overriding Considerations, and Adopting a Mitigation Monitoring and Reporting Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2012 3:02:32 PM
Creation date
2/28/2012 2:56:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Date
2/21/2012
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 1 Introduction Attachment "A" <br />• alley, and a portion of West Segerstrom Avenue, along with the installation of new sidewalks in <br />areas where existing sidewalks have fallen into a state of disrepair and/or will be demolished during <br />lift station construction. Some existing landscaping along West Segerstrom Avenue will remain. <br />The Project also includes the installation and operation of approximately 1,300 linear feet of new <br />underground sewer infrastructure, including approximately 560 linear feet of 15-inch gravity sewer <br />pipe; approximately 190 linear feet of 12-inch gravity sewer pipe; approximately 545 linear feet of <br />10-inch force main; and sewer manholes and appurtenances. Construction of these new facilities will <br />occur beneath the paved rights-of-ways of South Bristol Street and West Segerstrom Avenue. The <br />new infrastructure will be needed to connect several existing sewer mains to the Project. <br />After construction of the Project is complete and the new subsurface sewer pipes and manholes are <br />installed, the new lift station will move effluent through the station and into gravity sewer lines, <br />which will convey the sewerage to the Orange County Sanitation District's (OCSD) Reclamation <br />Plant No. 1, located in the City of Fountain Valley adjacent to the Santa Ana River. Effluent will <br />continuously flow through the Project and will not be stagnant. The Project will replace the <br />Segerstrom Lift Station and will not increase the capacity of the City's existing sewer system. The <br />Project will be constructed with odor control devices and the City will regularly monitor the facility <br />to ensure it is functioning properly. <br />After the Project has been constructed and is in operation, demolition of the existing Segerstrom Lift <br />Station will occur. Demolition activities will involve abandonment in place of the existing lift station, <br />including the removal and disposal of all lift station equipment and filling of the existing wet well <br />manhole with sand. An existing generator, located southerly of the existing lift station, will remain <br />in place and will serve as a back-up power source for the proposed Project. Some removal and <br />replacement of existing sidewalk and roadway pavement will occur in association with proposed <br />demolition activities. Demolition of the existing Segerstrom Lift Station will occur in conformance <br />with all applicable federal, state, and local regulations and standards. All roadway segments <br />disturbed by Project construction will be resurfaced. <br />CEOA Compliance <br />As described in Section 1.3.1 of the EIR, the City originally prepared and processed a Mitigated <br />Negative Declaration (MND) for the proposed Project in December 2008. The MND was adopted by <br />the City Council on February 2, 2009. However, the MND was challenged in California Superior <br />Court by an adjacent property owner, and the Court ordered the lead agency to vacate its approval of <br />the MND and required preparation of a project EIR. The City published a Draft EIR for the Project <br />and circulated it for public review between July 14, 2010 and September 10, 2010. Following the <br />City's review of comment letters received in response to the Draft EIR and a previously prepared <br />(but never certified) Final EIR, the City determined a need to incorporate substantive revisions to the <br />Draft EIR, thereby necessitating a re-circulation of the Draft EIR for an additional public review <br />period. Accordingly, the City prepared a Recirculated Draft EIR (RDEIR) and sent a notice of <br />completion to the Office of Planning and Research on September 14, 2011 and provided notice of the <br />availability of the RDEIR as required by CEQA Guidelines Section 15087, which began a 47-day <br />public review period for the RDEIR that concluded on October 31, 2011. <br />The key procedural actions related to the proposed Project and CEQA to date include: <br />• <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 1-2 <br />CEQA Findings of Fact/Statement of Overriding Considerations
The URL can be used to link to this page
Your browser does not support the video tag.