My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - 200 EAST FIRST AMERICAN WAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
03/05/2012
>
75A - PH - 200 EAST FIRST AMERICAN WAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 3:30:58 PM
Creation date
3/1/2012 2:11:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
3/5/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXH113IT A <br />OFFS -81TE IMPROVEMENTS <br />Block Wall <br />a. Main Street between Murphy & Sunflower, and house located at 101 W. Murphy <br />b. North side of Sunflower between Main & alley adjacent to four plexes, excluding <br />sections of wall at corner of Main & Sunflower at rear of commercial building <br />o. Plaster and paint with one color selected by Association <br />d. $3,000 per house payment for repair /replacement of landscaping associated with <br />wall improvements upon execution of Nexus right -of -entry for constntction and <br />exterior -wall maintenance easement, Ills payment shall be made by Nexus at the <br />time the individual property owner executes the construction casement in favor of <br />Nexus and permanent maintenance easement (for the climbing vines) in favor of <br />the City. For any "hold outs" (as defined in paragraph 6.b, of this Agreemeni, <br />Nexus shall make the $3,000 payment to Sandpointo in trust for each hold out, <br />o. Remove and replace 16 sections of white concrete block wall in immediate area of <br />MacArthur Boulevard and Flower Street, and paint with one color selected by <br />Association, <br />f. Remove and replace 4 sections of white concrete block wall along Wool Alton <br />Avenue and paint with one color selected by Association, <br />g. Nexus shall install climbing vines, species identified by the City, along the outer <br />edge of the wall, install irrigation to feed said climbing vines which shall be <br />connected and metered by Nexus at the nearest City water supply, and shall <br />reconstruct the sidewalk to the City's specifications after installation of the <br />irrigation lines and block wall. <br />h. Wall replacement specifications shall be established pursuant to paragraph 4 of <br />this Agreement. <br />i. Nexus shall maintain, and replace as necessary, the climbing vines during a ninety <br />(90) day plant establishment phase following item no. l.g. <br />2. Window Replacements <br />a. Nexus shall provide $3,500 construction allowance per house for sound proof <br />window replacements for up to 49 residential units located along Matti Street and <br />Sunflower Avenue behind the existing concrete wall to be replaced. The 49 <br />residential units are identified in Exhibit A -1 to ibis Agreement. <br />b. Nexus shall assist Sandpointo in obtaining/proparing necessary construction bids, <br />documents and permits. <br />e. Allowance will be paid by Nexus to Sandpointo for any applicable home upon <br />receipt of bona tide construction or material invoices. <br />d. Allowance shall expire 12 months following the completion of the concrete wall <br />EXHIBIT D <br />t i Ordinance No. NS -2680 <br />Page 45 of 61 <br />75A -105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.