My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - 200 EAST FIRST AMERICAN WAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
03/05/2012
>
75A - PH - 200 EAST FIRST AMERICAN WAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 3:30:58 PM
Creation date
3/1/2012 2:11:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
3/5/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
damage. <br />(54) Disclosure and release: CC &R's shall provide notice to prospective <br />owners of the urban character of the City and this area, including but not <br />limited to the permitted uses of the property and buildings in the immediate <br />area of the development (e.g., MacArthur Place, Griffin Towers, and <br />surrounding property zoned and /or devoted to commercial use), and shall <br />provide a release of all claims against the City which may arise from or <br />relate to the disclosed matters. <br />(05) Terms and Content, - <br />i. CC &R's are to be in effect in perpetuity. <br />ii, Any proposed modifications to the CC &R's will require <br />approval by the Agency's Executive Director. <br />iii, CC &R's shall provide a significant financial penalty (i.e., th® <br />�er�t�ittefl- lay -kaw) that shall be imposed by the Home <br />Owner's Association to any member who violates these provisions <br />If the Project requires a conversion from rental units to condominiums at the time <br />of recording; the Final Man the Owner must abide by and comply with the requirements and_ <br />conditions of Santa Ana Municipal Code sections 3d -331, et seq., pertaining to residential <br />conversion projects, prior to recording of the Final Map, <br />5.9 Responsibility li�for Costs of Work Oof Public Art. The City and <br />Owner agree that Owner shall be responsible for all costs associated with the design, <br />construction, maintenance and repair of the work of public at provided for in the Public Art <br />Plan. <br />5.10 Moratoria. Moratoria enacted by the City for the public health, safety, <br />and welfare, which are imposed on the Property or Project, shall toll the time periods set forth in <br />this Agreement. <br />5.11 City to Receive Contract Documents. Owner shall furnish City, upon <br />written request, copies of contracts and supporting documents relating to the work of public art. <br />5,4 -312 Conditions of Discretionary Approvals. The requirements imposed as <br />conditions of any discretionary approval received through the City's existing regulatory process <br />shall be governed by the terms of those approvals, and in no event shall such conditions be <br />affected by the termination, cancellation, rescission, revocation, or default or expiration of this <br />Agreement. <br />5.4413 Compliance Wtivith Governmental Requirements. Subieet to and as <br />otherwise provided by the terms of Section 5.1 above, Owner shall carry out the design, <br />13 <br />75A -78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.