Laserfiche WebLink
EXHIBIT 3 <br />MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Claudia C. Alvarez <br />COUNCILMEMBERS <br />David Benavides <br />Carlos Bustamante <br />Michele C. Martinez <br />Vince Sarmiento <br />Sal Tinajero <br />February 9, 2012 <br />CITY OF SANTA ANA <br />20 Civic Center Plaza • P.Q. Box 1988, M-21 <br />Santa Ana, California 92702 <br />Mark Lehman <br />President <br />LEHMAN CONSTRUCTION, INC. <br />P.O. Box 3569 <br />Tustin, CA 92781 <br />Re: Project No. 09-6036, Edna Park Improvements <br />Dear Mr. Lehman: <br />INTERIM CITY MANAGER <br />Paul Walters <br />INTERIM CITY ATTORNEY <br />Joseph Straka <br />CLERK OF THE COUNCIL <br />Maria D. Huizar <br />The Santa Ana Public Works Agency issued a Notice Inviting Bids for the above <br />project. After bids were opened on January 17, 2012, the City received your bid protest <br />from Lehman Construction, Inc., requesting that the low bidder and second bidder be <br />disqualified for failure to comply with the bid specification requiring the listing of all <br />subcontractors providing one-half of 1 % of the work. <br />The protesting party has the burden of proof to demonstrate that the staffs <br />determination of proposed low bidder is arbitrary and capricious, or unsupported by <br />substantial evidence in the record. <br />A protest hearing was held on February 2, 2012, at which you were present for Lehman <br />Construction, Inc., and Don Henderson and Rosie Toledo were present for Green Giant <br />Landscape, Inc. The following information was presented: <br />• Green Giant Landscape, Inc. submitted the low bid of $219,000.00. One-half of <br />1 % of Green Giant's bid is $1095.00. <br />• The bid specification named the required flooring system to be installed in the <br />project: Sun Belt Flooring System as installed by Sunbelt Flooring, Inc., including <br />preparation and installation of the "Heavy Duty Flooring No. 1100 Chemical <br />Resistant Industrial Floor". <br />• Green Giant's bid did not list a subcontractor for the epoxy flooring, and did not <br />propose a substitute flooring system. <br />23A-12