My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - EDNA PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
03/05/2012
>
23A - EDNA PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2012 6:01:46 PM
Creation date
3/1/2012 5:41:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
3/5/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20.00 SPECIAL PROVISIONS - Epoxy Flooring <br />GENERAL <br />20.01 DESCRIPTION <br />A. Section Includes <br />1. Provide labor and materials for a multiple component, seamless, anti- <br />microbial, chemical & thermal shock resistant, epoxy flooring system, <br />including surface preparation, primers, and finish coats. <br />B. Acceptable Manufacturers and Installers <br />1. SUNBELT FLOORING, INC., Phone: (909) 606-7623, Fax: (909) 606-7685 <br />2. Manufacturer approved Installer, who has technical qualifications, currently <br />approved in writing, and facilities to install specified systems. <br />20.02 DELIVERY. STORAGE AND HANDLING <br />A. Deliver material to job site in clean, clearly labeled containers and inspect prior to start <br />of job. <br />B. Store material in a dry, enclosed area protected from the elements. Keep temperature <br />of storage area between 60°F and 90°F. <br />20.03 ENVIRONMENTAL REQUIREMENTS <br />A. Cure new concrete no less than 28 days under good conditions. <br />B. Verify that substrate is properly equipped with vapor barriers and perimeter drains. <br />C. Verify supply of adequate utilities, including electric, water, heat (between 60°F and <br />90°F.) and lighting of no less than 80 ft candles measured at floor surface. <br />D. Free work area of other trades during, and for a period of 24 hours, after floor <br />installation. <br />E. Protect finished floor from damage by subsequent trades. <br />20.04 WARRANTY <br />A. Submit a one year warranty against defects in material and workmanship upon <br />substantial completion of installation. <br />124 <br />23A-9
The URL can be used to link to this page
Your browser does not support the video tag.