My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R. J. NOBLE COMPANY (6)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
R. J. NOBLE COMPANY (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:12:29 PM
Creation date
3/7/2012 10:29:32 AM
Metadata
Fields
Template:
Contracts
Company Name
R.J. Noble Company
Contract #
Various
Agency
Public Works
Council Approval Date
3/5/2012
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Approval <br />May 23, 2013 <br />Project Nos. 12 -6753, <br />Page 2 <br />of Change Order No. 2 <br />12 -7531 & 11 -2618 <br />CHANGE ANALYSIS <br />DETAILED JUSTIFICATION <br />This project is split into two stages; Phase 16 of the City's Residential Street Repair <br />and the Santiago Park Roadway Improvements. <br />Phase 16 City Residential Street Repair Project addresses the remaining asphalt <br />streets that were identified as part of the Residential Street Repair Program. These <br />segments of local streets were identified as a high priority for rehabilitation in the <br />City's pavement management system. <br />Santiago Park Roadway Improvements addresses the service and access roads in <br />and around Santiago Park. These roads provide access to the wildlife and <br />watershed center, nature reserve, the archery range and access for City staff to <br />water production facilities. <br />This Change Order is entirely within the Santiago Roadway Improvements phase of <br />the project and encompasses modifications to the wrought iron fence, addition of a <br />decomposed granite walkway and pressure treated wood parking stops in Santiago <br />Park. A prior approval was granted for this work on December 10, 2012. This work <br />was done partially under contract bid items and partially on a time - and - material <br />basis. <br />The work included clearing and grubbing, relocation of existing irrigation heads, <br />construction of a decomposed granite trail, and installation of pressure treated <br />beams to create a barrier between pedestrians and vehicular traffic. A small portion <br />of this extra work was done using contract bid items; the majority of the extra work <br />was done on a time - and - materials basis. <br />REVISED DETAILS <br />Contract Section <br />Revised Section <br />6 0" <br />H I MODIFIED DETAIL W /WALK <br />
The URL can be used to link to this page
Your browser does not support the video tag.