My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GREEN GIANT LANDSCAPE, INC. (8)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
GREEN GIANT LANDSCAPE, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:02:05 PM
Creation date
3/7/2012 10:54:23 AM
Metadata
Fields
Template:
Contracts
Company Name
GREEN GIANT LANDSCAPE, INC.
Contract #
09-6036
Agency
Public Works
Council Approval Date
3/5/2012
Expiration Date
8/19/2013
Destruction Year
2017
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Claudia C. Alvarez <br />COUNCILMEMBERS <br />David Senavides <br />Carlos Bustamante <br />Michele C. Martinez <br />Vince Sarmiento <br />Sal Tinaiero <br />February 9, 2012 <br />EXHIBIT 3 <br />CITY OF SANTA ANA <br />20 Civic Center Plaza • P.O. Box 1988, M-21 <br />Santa Ana, California 92702 <br />Mark Lehman <br />President <br />LEHMAN CONSTRUCTION, INC. <br />P.O. Box 3569 <br />Tustin, CA 92781 <br />Re: Project No. 09 -6036, Edna Park Improvements <br />Dear Mr. Lehman: <br />INTERIM CITY MANAGER <br />Paul Wafters <br />INTERIM CITY ATTORNEY <br />Joseph Straka <br />CLERK OF THE COUNCIL <br />Maria D. Huizar <br />The Santa Ana Public Works Agency issued a Notice Inviting Bids for the above <br />project. After bids were opened on January 17, 2012, the City received your bid protest <br />from Lehman Construction, Inc., requesting that the low bidder and second bidder be <br />disqualified for failure to comply with the bid specification requiring the listing of all <br />subcontractors providing one -half of 1 % of the work. <br />The protesting party has the burden of proof to demonstrate that the staffs <br />determination of proposed low bidder is arbitrary and capricious, or unsupported by <br />substantial evidence in the record. <br />A protest hearing was held on February 2, 2012, at which you were present for Lehman <br />Construction, Inc., and Don Henderson and Rosie Toledo were present for Green Giant <br />Landscape, Inc. The following information was presented: <br />• Green Giant Landscape, Inc. submitted the low bid of $219,000.00. One -half of <br />1 % of Green Giant's bid is $1095.00. <br />• The bid specification named the required flooring system to be installed in the <br />project: Sun Belt Flooring System as installed by Sunbelt Flooring, Inc., including <br />preparation and installation of the "Heavy Duty Flooring No. 1100 Chemical <br />Resistant Industrial Floor ". <br />• Green Giant's bid did not list a subcontractor for the epoxy flooring, and did not <br />propose a substitute flooring system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.