Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> Proj. 06-1500, 07-3206, & 09-3521 <br /> CITY OF SANTA ANA ADDENDUM NO. THREE <br /> March 27, 2009 <br /> <br /> PROJECT NOS. 06-1500,07-3206, AND 09-3521 <br /> <br /> PROPOSAL & CONTRACT AGREEMENT <br /> BID PROPOSAL, (continued) <br /> <br /> <br /> Proiect 07-3206 (SA-03 Modification) Schedule B <br /> Item # Bid Item Unit Quantity Unit Price Amount <br /> <br /> 105. Sheeting, Shoring and Trench LS 1 $ Zak l 00 <br /> Protection <br /> 106. Construct 10" CML&C Steel Pipe LF 170 $ '-/Z . $ _774 '(ZC) <br /> Water Main <br /> Construct 12" X 10" Hot Tap with <br /> 107. Tapping Sleeve and Valve per City EA 1 $ t-{1St.-o $ '{'S__& C, <br /> Std. Plan No. 1408 <br /> 108. Construct Flow Control Vault LS 1 $C~C3( > <br /> <br /> 109. Construct Modifications to SA-3 LS 1 $ 73-&4 C~C~G <br /> Vault <br /> 110. Construct Electrical and LS 1 $1 t/,15 <br /> Instrumentation <br /> 111. Replace Damaged Traffic Loops, EA 2 $ -3 $ <br /> Detectors and Wiring <br /> 112. Traffic Control, Striping and LS 1 $ 2, Kw <br /> Pavement Markings 1 <br /> 113. Replace Damaged Cross-Gutter LS 1 $ `o, ('D <br /> <br /> Project No. 07-3206 Schedule B Subtotal $ Yo , ' lw <br /> <br /> <br /> Proiect 09-3521 (Sewer Laterals) Schedule C <br /> <br /> 114. Construct 6" P.V.C. Sewer Lateral EA 6 $ . 1~d $ (LLC)o <br /> per C.S.A. Std. Plan No. 1204 <br /> <br /> Project No. 09-3521 Schedule C Subtotal $ (gam <br /> <br /> <br /> <br /> <br /> <br /> TO BE INCLUDED IN BID PACKAGE <br /> BP 8 of 21 <br />