Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> ADDENDUM NO. TWO <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> ELEVEN <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> REMOVE INTERFERING N <br /> PORTION OF EXISTING <br /> ELECTRICAL CONDUIT. <br /> FURNISH AND INSTALL <br /> NEW JUCTION BOX AND <br /> RECONNECT SERVICE <br /> TO SIGN (CONTRACTOR 3 #3 TIES M TOP 5" <br /> TO OBTAIN CITY OF <br /> SANTA ANA ELECTRICAL <br /> PERMIT). FINISH SURFACE <br /> USE 2500 PSI CONCRETE <br /> AND GRADE 40 REBAR k <br /> ~ z <br /> 1 k ~ ~ <br /> 3%' ANCHOR BOLTS BY 30" LONG o k <br /> PROVIDE 2 NUTS FOR EACH BOLT <br /> FOR LEVELING. BASE PLATE PER In ttq HORIZONTAL TIE <br /> -A L J6- <br /> MANUFACTURER POLE. 12" O.C. BOTH WAYS <br /> ~ k <br /> 4 #4 VERTICAL BARS W/ <br /> 36" STANDARD 900 HOOK AT TOP <br /> DIA. <br /> SIGN DETAIL <br /> (N. T.S.) <br /> APPENDIX J <br />