Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> Project 06-1500 <br /> RFA Change Order No. 2 <br /> July 29, 2010 <br /> Page 2 <br /> <br /> Part of this change order is to change the street pavement from Latex to regular <br /> asphalt concrete. Artificial turf does not require watering and therefore, <br /> eliminates daily surface runoff on the street from irrigation water. As a result, <br /> street pavement can be constructed with regular asphalt concrete instead of the <br /> specified latex asphalt concrete, which is more expensive. <br /> <br /> Artificial turf is aesthetically pleasing. It reduces water usage as well as inflow <br /> to the storm drain system. The cost of this change can be recouped in a few <br /> years from saving on water and maintenance costs. <br /> <br /> <br /> ESTIMATED COST = $165,328.75 <br /> <br /> <br /> <br /> <br /> APPROVED AS TO FUNDS AND ACCOUNTS: <br /> <br /> <br /> Raul Godinez, II Francisco Gutierrez <br /> Executive Director Executive Director <br /> Public Works Agency Finance and Management Services Agency <br /> <br /> K:\Construction\Projects\06-1500\Change Orders\06-1500 RFA CO 2.doc <br />