My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (7)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ALL AMERICAN ASPHALT (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:40:28 AM
Creation date
3/12/2012 2:43:33 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
Various
Agency
Public Works
Council Approval Date
6/18/2007
Expiration Date
3/16/2012
Destruction Year
2012
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Project 06-1500 <br /> RFA Change Order No. 5 <br /> February 8, 2012 <br /> Page 2 <br /> <br /> <br /> 2. In order to prevent loose gravel from entering the nearby catch basin at the northeast <br /> corner of Bristol Street and McFadden Avenue, the contractor was directed to remove <br /> three inches of gravel and pave the area with three inches of asphalt. The work also <br /> added a concrete curb that will address the gap between the existing grade and bottom <br /> of chain link fence. This work was done on time and materials. This work was done on a <br /> time-and-materials basis. <br /> <br /> AGREED COST = $17,560 <br /> 3. The synthetic turf area in the linear park near the Highland Street cul-de-sac along the <br /> east side of Bristol Street was being used for open-park like activities for which it was not <br /> designed; therefore the new turf was being damaged. In order to discourage this type of <br /> heavy use and prolong the lifespan of the turf, the contractor was directed to install six <br /> London Plane Sycamore trees with irrigation in this area. This work was done on a time <br /> and materials basis. <br /> <br /> FINAL COST = $12,772 <br /> 4. When the proposed natural turf was replaced by artificial turf, the irrigation for that <br /> portion of the project was deleted and a credit was issued to the contract. Subsequently, <br /> it was necessary to add a bubbler irrigation system to water the trees planted within the <br /> artificial turf area. This work was done on a time and materials basis. <br /> <br /> FINAL COST = $25,500 <br /> <br /> 5. During construction of the M.W.D. vault extension, M.W.D. requested adding temporary <br /> power and additional wiring and circuits for the flow monitoring equipment. This required <br /> new electrical permits causing delays to the project. This compensates the contractor for <br /> costs incurred for the delays. <br /> FINAL COST = $16,562 <br /> <br /> <br /> APPROVED AS TO FUNDS AND ACCOUNTS: <br /> n, <br /> <br /> Rau Godinez, II Francisco Gutierrez r <br /> Executive Director Executive Director <br /> Public Works Agency Finance and Management Services Agency <br /> <br /> <br /> K:\Construction\Projects\06-1500\Change Orders\06-1500 RFA CO 5.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.