My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19D - REQUEST FOR PROPOSALS FOR TEMPORARY ENGINEERING AND TECHNICAL SUPPORT SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
03/19/2012
>
19D - REQUEST FOR PROPOSALS FOR TEMPORARY ENGINEERING AND TECHNICAL SUPPORT SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2012 6:25:38 PM
Creation date
3/15/2012 3:20:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19D
Date
3/19/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The positions the Consultant may need to fill include the following: <br />Engineering/TechnicaI <br />• Senior Civil Engineer (PE license required) <br />• Senior Engineer <br />• Assistant Engineer <br />• CAD Drafter <br />• CD Designer/Technician <br />• Senior CAD Designer/Technician <br />• Land surveyor (LS license required) <br />Construction/field <br />Construction inspection <br />Field technician <br />Administrative/Accounting <br />• Accounting Assistant <br />• Administrative Assistant <br />All technical positions shall be proficient in Microstation and Microsoft Office. The City <br />currently uses Microstation Version V8i and Microsoft Office 2007. Licensed Civil engineer or <br />land surveyor may be required to sign plans and legal documents, respectively. <br />After a temporary position is identified by the City, the selected firms may be asked to provide <br />resumes of candidates. The City will provide a workstation for each temporary employee. <br />CITY BUSINESS LICENSE <br />The selected Proposer shall be required to obtain a City of Santa Ana Business license within <br />30-days of selection and must provide a copy to the City Projects Manager or designee prior <br />to commencing any work in Santa Ana. <br />E-MAIL COMMUNICATIONS AND INTERPRETATIONS/CLARIFICATIONS <br />To facilitate the Request for Proposals (RFP) process, Proposers are required to monitor and <br />respond to e-mail requests within 48 hours. No oral interpretations will be made by the City <br />to any Proposer as to the meaning of requirements identified herein, including the Scope of <br />Service and Terms and Conditions. Every request for such an interpretation must be made in <br />writing via e-mail to the Projects Manager no fewer than five calendar days prior to the date <br />set for opening of proposals. Significant interpretations or clarification will be made by an <br />addendum to this RFP, which will be sent as promptly as is practicable to all persons to <br />whom the Request for Proposals have been issued by the City. Addenda may become part <br />of the agreement documents. <br />Page 4 of 21 <br />19D-6
The URL can be used to link to this page
Your browser does not support the video tag.