Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> EXHIBIT "E" <br /> <br /> Remaining Offshe Mitigation Measures <br /> <br /> <br /> The Met at South Coast Public Improvements <br /> Improvement Location <br /> New sidewalk Property frontage on First American Way <br /> New driveway ("pan" style) First American Way <br /> Dedication for 25'x 25' comer cut-off NIE comer of MacArthur & Imperial <br /> Promenade <br /> Sidewalk easement 10' along propegy frontage of MacArthur Blvd. <br /> Street dedication 60' from street centerline along MacAfthur <br /> Blvd. <br /> 4" depressed curb Emergency access on MacArthur Blvd. <br /> Triple-left traffic mitigation measure, Southbound Imperial Promenade at MacArthur <br /> including sign bridge, signal modification, Blvd <br /> updated detection, and signing and striping <br /> on both streets <br /> Pavement Rehabilitation minimum 2" On Imperial Promenade and First American <br /> grind and overlay) Way along grope , frontage from curb to street <br /> centerline <br /> Installation of new public fire hydrants Along MacArthur Blvd. and First American <br /> Way <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 75A-171 <br />