Laserfiche WebLink
TAVA Development Company Project <br />Change Order— December 2, 2011 <br />Assumptions: <br />• Project maps will be created by URS at scale sufficient to document clearly (e.g., 1" = 200', 1" _ <br />100') the limits of the survey coverage and the extent of the undertaking. Maps will be created <br />with an aerial and topographic base. <br />• Photographic simulations or conceptual plans depicting the proposed project will be provided by <br />the Applicant or City. <br />• Revised DPR 523 series forms will be prepared for the project area. <br />• Photographs captured by previous consultants as part of earlier studies will be made available to <br />the URS by the City. <br />• Area of analysis would include only the properties directly acquired, used, or improved as part of <br />the project. Properties outside of the project boundaries would not be analyzed as part of the <br />supplemental memorandum for significance and impacts. <br />• No additional fieldwork will be completed as pact of this assessment. Limited out -of -office <br />research is anticipated, with no more than one research trip to a local historical society, archive, <br />repository or library. <br />• No more than two teleconferences with the City will be needed during preparation of the <br />memorandum. <br />• The memorandum will identify the project site as being eligible for listing to the local City <br />register and the project would have a significant impact to historical resources for purposes of <br />CEQA. <br />• The memorandum will be peer reviewed before work is submitted to the City by a Principal -level <br />staff in our Cultural Resources Group with experience in dealing with complex projects with <br />cultural resource issues. <br />• A draft of the technical memorandum will be submitted to the City for one round of review and <br />comment. URS will respond to the City's comments in writing via a response to comments <br />document and will make revisions to the supplemental technical memorandum as needed. <br />Task 2 — Revise Cultural Resources DEIR Section. <br />URS would revise the existing cultural resources DEIR section, which was circulated in July 2011. The <br />DEIR section would include non - confidential information from the memorandum, and would substantiate <br />the conclusions from the memorandum. The DEIR would include relevant figures, photographs, and <br />background data. The supplemental technical memorandum will be appended to the revised DEIR. <br />Assumptions: <br />• Revised DEIR section would include changes to the following subsections: 5.4.1; 5.4.2; 5.4.3; <br />and, 5.4.5 <br />• Revised DEIR section would not include changes to mitigation measures CUL -1 through CUL -8 <br />as indicated in Subsection 5.4.4, or any other sections of the DEIR <br />City of Santa Ana Page 2 <br />25B -7 <br />