My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-03-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
03/19/2012
>
FULL PACKET_2012-03-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 2:55:55 PM
Creation date
3/15/2012 6:25:11 PM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
3/19/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E Charging 101... <br />EVSE — Electric Vehicle Supply Equipment <br />• EVSEs serve primarily as a SAFETY device <br />between the Power Grid (Building Power <br />Supply) and the electric vehicle. <br />• The safety of the unit includes: <br />• Safety Electronics (GFI) <br />• Vehicle Charging Cord <br />• SAE - SAE- ,11772TM compliant connector <br />• SAE Communications Interlock <br />• Pilot Signal Control Circuit Interface with <br />the vehicle <br />CLIPPERCREEK, INC. <br />INNOVATIVE INFRASTRUCTURE FOR <br />® ELECTRIC AND HYBRID VEHICLES <br />.40 <br />25F -18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.