My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - 803 SOUTH SULLIVAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
04/02/2012
>
25A - AGMT - 803 SOUTH SULLIVAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2012 11:42:06 AM
Creation date
3/29/2012 11:08:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25A
Date
4/2/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> Bat Nha Buddhist Meditation Center MND i City of Santa Ana Planning Division <br /> <br /> <br /> The significance of noise impacts resulting from the proposed project will be assessed based on relevant <br /> thresholds (city, state and federal). If significant noise impacts are identified, mitigation measures to reduce <br /> impacts to a less-than-significant level (where feasible) will be recommended. The results of the noise analysis <br /> will be provided in the noise section of the ISIMND. Any technical data or modeling will be provided in an <br /> appendix. <br /> Cultural Resource Evaluation <br /> ICF recommends that a records and locality database search be conducted to evaluate the potential for <br /> archeological and paleontological resources to be found on the project site. This evaluation Wit: <br /> ® Conduct a literature and records search at the South Central Coastal Archaeological Information Center <br /> of the California Historical Resources Information System at California State University, Fullerton, to <br /> determine if any prehistoric or historical cultural resources have been recorded within project area. <br /> Review published geologic and paleontological literature and museum databases, including the Los <br /> Angeles County Museum of Natural History database. <br /> ® In coordination with the City, ICF will contact with the Native American Heritage Commission and local <br /> Native Americans regarding the project. <br /> Because the project area is completely developed, an archaeological field survey will not be conducted. <br /> The findings of the cultural and paleontological resource investigations will be used to provide an assessment of <br /> the sensitivity of the project area for prehistoric archaeological and paleontological resources. The findings of <br /> this research will be summarized in the Cultural Resource section of the ISIMND. The MND will also provide <br /> mitigation measures, if necessary. <br /> Historic Resource Evaluation <br /> ICF will conduct a historic analysis to evaluate potential impacts of the proposed project in accordance with <br /> CEQA requirements. The project would demolish two single-family homes and several ancillary buildings on the <br /> project site. The buildings on the 803 South Sullivan Street parcel appear to date from the early 1960s. <br /> However, the building on the northern parcel (719 South Sullivan Street) was built in 1927 and is a Craftsman <br /> style home that retains integrity and meets the 50 year old age crlterla for potentially historic resources. <br /> To identify any historical resources related to the 1927 building located on the 719 South Sullivan Street parcel <br /> an ICI= qualified architectural historian will conduct a field visit and research City data sources that might yield <br /> historic data regarding the project site. This analysis will determine if the site contains potentially historical <br /> resources per CEQA Guidelines Section 15064.5, which evaluate the building in relation to any significant <br /> contribution to important historic events, persons, or architecture. The historic findings will be summarized in the <br /> Cultural Resource section of the ISIMND. Because the project site is not anticipated to contain historic <br /> resources (per section 15064.5), this scope of work does not include preparation of DPR 523 forms, or further <br /> technical analysis beyond preparation of the MND section. <br /> Traffic Impact Analysis (TIA) <br /> As a subconsultant to ICF, Fehr & Peers will prepare a project-specific TIA to evaluate the traffic related impacts <br /> of the proposed project. The TIA will be summarized in the traffic section of the IS/MND and included as an <br /> appendix. The following tasks are proposed to be completed as part of the TIA; however, as described below, <br /> these tasks will be refined in coordination with the City Traffic Engineering Division upon receipt of additional <br /> project operational information. <br /> ® Confirm Traffic Analysis Scope. Fehr & Peers will meet with the City's traffic engineering team of to <br /> review and approve our approach to preparing the traffic study. Specific items that would be addressed in <br /> this scoping memorandum include: <br /> <br /> Page 11 <br /> <br /> 25A-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.