Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> EXHIBIT "E" <br /> <br /> Remaining Offsite Mitigation Measures <br /> <br /> The Met at South Coast Public Improvements <br /> <br /> Improvement Location <br /> New sidewalk Property frontage on First American Wax <br /> New driveway"pan" style) First American Way <br /> Dedication for 25'x 25' comer cut-off NIE comer of MacArthur & Imperial <br /> Promenade <br /> Sidewalk easement 10' along property frontage of MacArthur Blvd <br /> Street dedication 60' from street centerline along MacArthur <br /> Blvd. <br /> 4" depressed curb Emergency access on MacArthur Blvd <br /> Triple-left traffic mitigation measure Southbound Imperial Promenade at MacArthur <br /> including si bridge signal modification Blvd <br /> updated detection, and signing and striping <br /> on both streets <br /> Pavement Rehabilitation (minimum 2" On Imperial Promenade and First American <br /> grind and overlay) Way along property frontage from curb to street <br /> centerline <br /> Installation of new public fire hydrants Along MacArthur Blvd. and First American <br /> Way <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 11 A-54 <br />