Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> EXHIBIT A <br /> SCOPE OF SERVICES <br /> <br /> <br /> This Request for Proposal calls for the removal and replacement of the existing street light cable <br /> <br /> on Broadway between 17`n Street and Santa Clara Street and on Sycamore Street between Russell <br /> Street and Borchard Street. This project will require replacing all the cable in the entire system <br /> <br /> with three new #8 THW wires. The 46 existing poles are required to be rewired with new #12 <br /> THW wire, the existing fixtures removed and salvaged, replaced with new 150W high pressure <br /> <br /> sodium fixtures and lamps (Broadway, double fixture king poles) or 70W metal halide fixtures <br /> and lamps (Sycamore, single fixture concrete poles). The new fixtures may need minor <br /> modifications to fit existing pole configurations. Costs for modification shall be included in the <br /> <br /> lump sum proposal amount. Three new service pedestals will be furnished and installed by the <br /> Proposer. Proposer shall locate and intercept existing conduit adjacent to service pedestal and <br /> <br /> install conduits and pull box adjacent to pedestal. All costs for conduit work, including hardscape <br /> replacement, to connect to service pedestal shall be included in lump sum costs. New wire shall <br /> <br /> be placed into and connected properly in service pedestal. All work, equipment, labor and <br /> materials necessary to provide complete functioning system shall be included in the Proposal <br /> <br /> pricing. Existing globes shall be protected, cleaned and reused. <br /> The existing streetlight systems were installed in the early 1920's and are obsolete. The exact <br /> <br /> condition and location of the underground conduit is unknown although the existing cable was <br /> installed 10 years ago. The City expects the existing cable to be used to pull in the new wire. Pre- <br /> <br /> lubrication of the conduits may be necessary. The City does not anticipate that much of the <br /> existing conduit will need to be repaired. All costs for conduit repair excluding materials will be <br /> <br /> included in the costs proposed for hourly work. The Proposer may need to excavate and access <br /> and disconnect the existing conduit sweeps at the pole foundations to properly pull the new wire. <br /> <br /> All costs for excavation, including hardscape replacement and conduit disconnect/reconnect shall <br /> be included in the lump sum price. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 25C-11 <br />