Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> PART H SPECIFICATIONS <br /> EXCAVATING AND BACKFILLING <br /> <br /> Excavating and backfilling shall conform to Section 86.2.01, "Excavating and Backfilling"of the <br /> California State Specifications (CSS) and these Special Provisions. <br /> The following paragraph shall be added to Section 86-2.01: <br /> <br /> All excavated material in roadway shall be removed from the site and backfilled with compacted crushed <br /> aggregate base material topped with temporary asphalt concrete on the same working day as removed. A <br /> temporary alternative to backfilling, with permission of the Agency, shall be the placement of steel plates <br /> with temporary asphalt concrete ramping at edges of the steel plates. Such plating shall not be allowed <br /> for more than five (5) working days, after which backfill shall be required. <br /> Slurry backfill: Use of a one-sack cement and sand slurry provided by a commercial ready-mix concrete <br /> vendor may be permitted except in parkway areas. The slurry shall be placed monolithic from the bottom <br /> of the excavation to the bottom of the existing structural section or sidewalk; or as directed by the <br /> Agency. <br /> <br /> CONDUIT <br /> Roadway lighting conduit shall conform to the provisions in Section 86-2.05, "Conduit", of CSS and these <br /> Special Provisions. <br /> <br /> Roadway lighting conduit shall be schedule 80 PVC unless shown otherwise on the plans. Insulated bonding <br /> bushings will be required. <br /> <br /> All conduits, excluding SCE service conduits, shall be installed at the depth not less than 42" below <br /> finished grade in pavement areas 24" in sidewalk and parkway areas. Only when conduits are to be <br /> installed between adjacent pull boxes, from street light pole to pull box or pull box to cabinet where the <br /> in-between distance is too short to meet the 42" depth and the 45-degree sweep requirements, the conduit <br /> may be installed at lower depth but not less than 18" below finished grade. <br /> After conductors have been installed, the ends of conduits shall be sealed with industry grade sealing <br /> compound. <br /> <br /> Replace sidewalk and pavement in-kind to match existing material, color, and pattern, from score mark to <br /> score mark after pull boxes and conduit have been installed. Payment for replacement of sidewalk, <br /> pavement, hardscape and landscaping shall be included in lump sum price. All costs for potholing, <br /> trenching, boring etc shall be included in lump sum price. <br /> PULL BOXES <br /> <br /> Pull boxes shall conform to the provisions in Section 86-2.06, "Pull Boxes" of CSS, CSP ES-8 and these <br /> Special Provisions. Notes 4(a)(5) and 4(b)(10) on CSP ES-8 shall not apply. <br /> Pull box size shall be Number 5 except where shown otherwise on the plan or as directed by the Agency. <br /> Bottoms shall be bedded in crushed rock. Pull boxes shall not be grouted. Pull boxes shall be polymer <br /> concrete reinforced with heavy-weave fiberglass. Pull box covers shall be lightweight (BES lite non- <br /> concrete, or approved equal). Pullbox lids shall be stamped "LIGHTING". <br /> New pull boxes shall not be installed within any curb access ramp. <br /> <br /> <br /> <br /> 25C-13 <br />