My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
04/02/2012
>
FULL PACKET_2012-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 2:47:15 PM
Creation date
4/2/2012 10:52:13 AM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
4/2/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MARCH 12, 2012 <br />PAGE 2OF3 <br />f. Branches should have a sweep similar to that of an actual <br />Eucalyptus Tree. <br />g. Branch foliage color should be an olive green with some other <br />appropriate coloring to match an actual Eucalyptus Tree. A sample <br />shall be submitted for approval prior to fabrication. <br />h. Full bark cladding with a custom color should be submitted for <br />approval prior to fabrication. <br />i. All antennas shall be covered with "antenna socks" that match the <br />approved foliage color. <br />j. All "stand -off mounts" and support pipe mounts shall be concealed <br />behind antennas and painted a darker shade or green (or black) with <br />a "flat" paint finish to reduce reflection and visibility of the mounting. <br />k. Include the tree specifications (selected manufacturers and models) <br />with photo simulations (also a site plan review requirement). <br />I. Show the location of the GPS antenna on all elevations. <br />M. Provide a "unistrut" detail for the utility cabinet; an "H- frame" is not <br />acceptable. <br />n. Provide a note on the plans stating "install underground utilities <br />sleeving for two carriers during construction of the structure ". <br />Shrouds on the outside of the pole are not acceptable. <br />o. All exterior conduit and electrical meters shall be installed and <br />screened in one metal enclosure painted to match the structure. <br />5. The permit applicant shall provide a 24 -hour phone number to which <br />interference problems may be reported. This condition will also apply to all <br />existing facilities in the City of Santa Ana. <br />6. The permit applicant will provide a "single point of contact" in its <br />Engineering and Maintenance Departments to insure continuity on all <br />interference issues. The name, telephone number, fax number and e-mail <br />address of that person shall be provided to the City's designated <br />representative upon activation of the facility. <br />Resolution No. 2012 -02 <br />Page 5 of 6 <br />31 A -17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.