Laserfiche WebLink
Federal law exempts local jurisdictions from regulating health <br />• related issues as these issues are covered under Federal <br />laws. However, the proposed facility will be in compliance <br />with both the Federal Communications Commission (FCC) <br />and Federal Aviation Administration (FAA) safety regulations. <br />3. Will the proposed use adversely affect the present economic stability <br />or future economic development of properties surrounding the area? <br />The proposed facility, in conjunction with the new eucalyptus <br />trees and required site improvements, will be compatible with <br />the surrounding area and will not adversely affect the <br />economic viability in the area. The stealth appearance and <br />site upgrades will be the major solution to maintaining and <br />increasing the economic stability for this industrial corridor. <br />4. Will the proposed use comply with the regulations and conditions <br />specified in Chapter 41 for such use? <br />The cellular facility has been designed to comply with the <br />regulations and conditions identified in Chapter 41 of the <br />Santa Ana Municipal Code for a major wireless facility. <br />5. Will the proposed use adversely affect the General Plan or any <br />specific plan of the City? <br />• The proposed facility will not adversely affect the General <br />Plan as cellular facilities that are designed to be compatible <br />with the surrounding environment are consistent with the <br />goals and objectives of the Industrial (IND) General Plan land <br />use designation. Policy 2.2 of the Land Use Element <br />encourages land uses that accommodate the City's needs for <br />services. <br />E. This project was reviewed in accordance with the Guidelines for the <br />California Environmental Quality Act. The project is exempt from further <br />review pursuant to Section 15303. This Class 3 exemption allows in-fill <br />developments for the construction and location of limited numbers of new, <br />small facilities or structures. Categorical Exemption Environmental <br />Review No. 2012-2 will be filed for this project. <br />Section 2. The Planning Commission, after conducting the public hearing, <br />hereby approves Conditional Use Permit No. 2012-04 as conditioned in Exhibit "A" <br />attached hereto and incorporated herein. This decision is based upon the evidence <br />submitted at the above said hearing, which includes, but is not limited to: the Request <br />for Planning Commission Action dated March 12, 2012, and exhibits attached thereto; <br />and the public testimony, all of which are incorporated herein by this reference. <br />ADOPTED this 12th day of March , 2012 by the following vote: <br />• Resolution Na. 2012-02 <br />Page 2 of 6 <br />