Laserfiche WebLink
Conditions for Aaaroval for Conditional Use Permit No. 2012-04 <br />• Conditional Use Permit No. 2012-04 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the California Building Standards <br />Code and all other applicable regulations. <br />The applicant must comply in full with each and every condition listed below rior to <br />exercising the rights conferred by this conditional use permit. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />A. Planning Division <br />1. The applicant must comply with all conditions and requirements of the <br />Development Review Committee for the development project (DP No. <br />2011-5). <br />2. Any amendment to this conditional use permit must be submitted to the <br />Planning Division for review. At that time, staff will determine if <br />administrative relief is available or the conditional use permit must be <br />• amended. <br />3. The proposed monopole shall be constructed as per approved plans and <br />any existing landscaping shall be protected in place during the construction <br />period for the 60-foot wireless facility. <br />4. The proposed monopole shall be constructed per the following <br />specifications: <br />a. <br />ne«e.,+ „a +tie ti.~.,..tie~ ~ti.,~ ~i,+ he e,.ti+ ae..+ .,. i.,.,,,e..MOdiired by <br />Planning Commission on March 12, 2012 <br />b. Branch disbursement should be random so that longer branches and <br />shorter branches are intermingled to give a natural appearance. <br />c. Branches should exceed all antennas by a minimum of 12 inches. <br />d. Branches should start at 15 feet above the ground. <br />e. There should be a minimum space of seven feet between the top of <br />the antenna and the top of the branches. <br />• <br />Resolution No. 2012-02 <br />Page 4 of 6 <br />