Laserfiche WebLink
MARCH 12, 2012 <br />• PAGE 3 OF 3 <br />7. The permit applicant shall insure that lessee or other user(s) shall comply <br />with the terms and conditions of this permit, and shall be responsible for the <br />failure of any lessee or other users under the control of permit applicant to <br />comply. <br />8. The permit applicant shall provide a coverage and cell site location map for <br />each existing and proposed facility in Santa Ana. <br />9. Locate all equipment and related appurtenances (Appleton plug and electric <br />meter) on the inside of the existing equipment enclosure or inside the <br />building and underground all electrical power from the utility source shown <br />on the approved site plan. <br />10. the-exi~o~ ~'~;g-s#a',;-pe-~erya;rRed. Tkae-a^~:ia,nt~hall sdbmit~aint <br />nrJnr nlec fr~r fhe infirm fn fhe Dhnnin.. ni.,i~inn Modified by <br />Planning Commission on March 12, 2012 <br />11. Conditional Use Permit No. 2012-04 expires 10 years from the date of City <br />Council approval. <br /> <br /> <br />Resolution No. 2012-02 <br />Page 6 of 6 <br />