Laserfiche WebLink
EXHIBIT "E" <br />Remaining Offsite Mitigation Measures <br />The Met at South Coast Public Improvements <br />Improvement <br />New sidewalk <br />New driveway{"pan" style) <br />Dedication for 25'x 25' comer cut-off <br />Sidewalk easement <br />Street dedication <br />Location <br />Proper frontage on First American Way <br />First American Wav <br />NIE comer of MacArthur & Im en rial <br />Promenade <br />10' alongrpropedy fiontage of MacArthur Blvd. <br />60' from street centerline along MacAilhur <br />Blvd. <br />4" depressed curb Emergency access on MacArthur Blvd. <br />Triple-left traffic mitigation measure, Southbound Imperial Promenade at MacArthur <br />including sign bridge, signal modification, Blvd <br />updated detection, and signing and striping <br />on both streets <br />Pavement Rehabilitation (minimum 2" On Imperial Promenade and First American <br />grind and overlay) Wa aallong property frontage from curb to street <br />centerline <br />Installation of new public fire hydrants Along MacArthur Blvd. and First American <br />Wav <br />11 A-54