My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (8)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ALL AMERICAN ASPHALT (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:40:38 AM
Creation date
4/19/2012 3:07:40 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
Various
Agency
Public Works
Council Approval Date
4/16/2012
Destruction Year
2017
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r?n? ?w?n?? w nT?nwr <br />REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />APRIL 16, 2012 <br />TITLE: <br />CONTRACT AWARD WITH ALL <br />AMERICAN ASPHALT FOR HAZARD <br />AVENUE REHABILITATION <br />(PROJECT NO.116749) AND ALTON- <br />GREENVILLE INTERSECTION <br />IMPROVEMENTS (PROJECT NO. <br />116750) <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />As Recommended <br />? As Amended <br />? Ordinance on1"Reading <br />? Ordinance on 2ndReading <br />? Implementing Resolution <br />? Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract toAll American Asphalt, Inc., the lowest responsible bidder, in accordance <br />with unit bid prices in the estimated amount of $984,984 for construction ofthe Hazard Avenue <br />Rehabilitation from Euclid to Harbor Project and the Alton- Greenville Intersection <br />Improvements Project. <br />2. Approve a funding analysis with a total estimated construction cost of $1,280,749. <br />DISCUSSION <br />The City's Pavement Management System has identified Hazard Avenue from Euclid Avenue to <br />Harbor Boulevard (Exhibit 1) as a high priority for rehabilitation. The pavement has deteriorated <br />due to weather, age, heavy usage, and poor drainage. Portions of the adjacent curb and gutter, <br />driveway approaches, curb ramps, and sidewalks are either missing or in disrepair and require <br />replacement. Improvements includereconstruction of pavement and replacement of damaged <br />concrete curb and gutter, driveway approaches, and sidewalk. In addition, there is an unimproved <br />section of Hazard between La Vergn Way and Morse Drive that will be widened with new <br />pavement, curb and gutter, sidewalk, and curb ramps. A storm drain will also be constructed <br />between Harbor and La Vergn Way to improve drainage. Once completed, these improvements <br />will extend the life of the pavement by 20 years, and enhance the ride quality, surface drainage <br />and appearance of the street as well as provide a safer route to school for students along the <br />south side of Hazard. <br />Included in the proposed contract are improvements to the Greenville Street and Alton Avenue <br />intersection. Construction in this intersection includes installation of new curb ramps, sidewalk, <br />and curb and gutteron the northwest and northeast corners of the intersection. On the east side of <br />Greenville, new sidewalk is proposed to close the gap from the existing intersection to just north of <br />the railroad crossing. These improvements will provide safe ADA access across the railroad <br />tracks, and complete an unimproved section of sidewalk that is used heavily by students.
The URL can be used to link to this page
Your browser does not support the video tag.