Laserfiche WebLink
AGREEMENT NO. C-1-3099 <br />EXHIBIT H <br />Side-by-Side of Required Information <br />for New Starts/Small Starts Evaluation and Rating <br />Reporting Item Required New Starts Small Starts Very Small Exempt <br /> Information Starts <br />Project Background <br /> Project <br />Project Description Description <br /> Template <br />Make the Case Document* Narrative, Data, <br /> Maps, Graphics <br />Certification of Technical Methods and Signed <br />Planning Assumptions Certification <br /> Data, <br /> methodology, <br />Documentation of existing, benefiting maps of affected <br />transit riders in corridor routes, evidence <br /> of benefit for <br /> affected riders <br />Project Maps <br />Project Site Map Map <br />Vicinity Map Map <br />Capital Costs <br />Standard Cost Categories, including SCC Worksheets <br />schedule, inflation, and funding <br />Annualized Cost Worksheets for Build SCC Worksheets <br />and Baseline <br />Travel Forecasts** <br />User Benefits Forecasts Summit Reports <br />Thematic Maps and Legend Summit Output <br /> Travel Forecast <br />Summary of Travel Forecasts Template, <br /> Narrative, Data <br /> (as necessary) <br />O&M Costs <br />Summary of O&M Cost Productivities Narrative, Data <br />" Evaluated as an "Other Factor." Submission of any other "Other Factor" is optional. <br />"` Simplified travel forecasting procedures and results may be acceptable for Small Starts projects. <br />Sponsors should discuss such procedures with FTA. <br />Page 1 of 2