My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORATION AUTHORITY (OCTA) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORATION AUTHORITY (OCTA) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:50:23 AM
Creation date
4/26/2012 4:31:45 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORATION AUTHORITY (OCTA)
Contract #
A-2011-255
Agency
PUBLIC WORKS
Council Approval Date
11/28/2011
Expiration Date
10/31/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-1-3099 <br />i not approve entry into PE, AUTHORITY is not obligated to reimburse CITY for any additional <br />2 PROJECT costs, beyond Preliminary Engineering. <br />3 D. Upon FTA approval to enter into PE, under the direction of the AUTHORITY, CITY <br />a shall be responsible for completing activities defined by FTA in EXHIBIT I "NEW STARTS <br />5 PROJECT PLANNING AND DEVELOPMENT CHECKLIST OF PROJECT SPONSOR <br />6 SUBMITTALS TO FTA TO ENTER FINAL DESIGN (FD)", attached hereto and incorporated by <br />7 reference, before requesting entry into Final Design (FD). <br />s E. Preliminary Engineering is defined by the Federal Transit Administration as <br />9 completion of 30-50% of the design drawings and specifications. At the conclusion of PE, as required <br />10 by the Federal Transit Administration, under the direction of the AUTHORITY, CITY shall complete all <br />ii documentation including, but not limited to documentation that defines any required right-of-way <br />12 acquisition, utility relocation, third party agreements and the preparation of final construction plans <br />13 (including construction management plans), detailed specifications, construction cost estimates, and bid <br />la documents. Under the direction of the AUTHORITY, CITY shall prepare the PROJECT's final financial <br />15 plan. CITY shall collect and analyze data needed to prepare the Before and After Study. Specifically, <br />16 the PE package shall include, but is not limited to: <br />17 1. Final Environmental Documentation <br />is 2. Vehicle fleet procurement strategy <br />19 3. 30% design completion including: <br />20 a. Complete alignment drawings <br />21 b. Complete station location drawings <br />22 c. 30% systems drawings including location of traction power substations <br />23 d. Major utility relocation mitigation plan <br />24 e. Real Estate parcel definition, Operations and Maintenance Facility <br />25 / <br />26 / <br />Page 7 of 16 <br />L. Camm\CLE RICAL\CLERICAL\WORDPROC\AGREE\AMEND\AG13009
The URL can be used to link to this page
Your browser does not support the video tag.