My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BRANDMAN ASSOCIATES 8 - 2012
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
MICHAEL BRANDMAN ASSOCIATES 8 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 12:53:37 PM
Creation date
5/14/2012 2:31:54 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BRANDMAN ASSOCIATES
Contract #
N-2012-050
Agency
Planning & Building
Insurance Exp Date
11/1/2015
Destruction Year
2017
Notes
Amended by A-2012-226
Document Relationships
MICHAEL BRANDMAN ASSOCIATES 8A - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DKlmley-Horn Mr. Tom Holm, November 1, 2011, Page 2 <br />t• _ and Assoclales, inc. <br />• <br />Task--ab—If field conditions- have charmed-substantfaily,-,ar+ftraffic-vohmtes are- <br />substantially-hlgher• than the-traf#ie volumes- In -the 20G9-Traffie -Impact Study, <br />#Men-INFniey-Horn- will- update- the intersection- and- Foadway- bevel-of-Servic-e <br />analysls-for-the following study scenarios: <br />v- -Existing ieondit ions <br />-cr - Opening-Yearwithout Pro}ect- <br />-cr - Opening-`fearwith-Project- <br />Note: The fee for this task is based on the assumption that the cumulative <br />projects analysis will not change. <br />• <br />Task 4a -if-the results -of the -Level -of Service -analysis Indicate -that -there would - <br />-be -ro-additional project Frrtpaets,-tier- no additionel-anetysis-will-be-needed: -Ar <br />-brief ietterof-findfngswouid be prepared-describfng tire -results -of the-Levei of - <br />Service analysis compared to -the -2fl69-Tr-affle4mpactStudy, -tor providesupport- <br />for-reliance -upon- -the- previoas -traffm-findings, -response s -to -common its-and- <br />-"t4ga4Ier► Measures.- <br />• Tagk-gh =-if thie Y4E5sU tf 6fitn6 Ce4e1 of SerriitLiff alSatyVS TffdWate-th3�thGr`e WOLhi <br />be additional -project -impacts compared-tn-the 2009 -Traffic tmpact-Study; then- <br />-Kimley-+iorrr-wHI-updatethe Traffic-lrrtpaet-Study- -T-he -rpdateyrrotfld- Include- - <br />-updating-the- eumuiative -projects-analysls, and identifying addltionaf mltigatlor} - <br />-measures to -mitigate thenew-projecttmpacts- - <br />• -Tas%3 � ffTtis de-teim�ned-fhaffhe�ritneed� Yo 66 re2RtLtat6d; 7Cihil€�i-i=16rTi <br />-wHl-partfcipate-in preparfng-responses ta-Lraf c -related comments- - - <br />• Task 6 - One project team meeting or conference call Is assumed. If required or <br />requested by the Applicant, the Client, or the City, attendance at additional <br />meetings will be billed on a per -meeting basis. <br />Fee <br />The Klmley-Horn fee for this effort Is broken down by each task. Tasks 1 and 2 will be <br />required tasks. Each successive task will be performed only If the condition <br />necessitating that task Is met. <br />Task Z - Update Traffic Data Collection (including traffic count expense) $ 2,850 <br />Task 2 - Update Traffic Field Conditions <br />800 <br />Task 3a - Letter Report Documenting Updated Traffic Conditions 2,500 <br />x�xx <br />-Task 3b -Update LevekAServiceAnalysis ------------------------4,500-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.