Laserfiche WebLink
2. STORE CHARACTERISTICS <br />This section of the report describes the characteristics of the two Contractors' Warehouse stores in <br />the Los Angeles area that were analyzed in this parking study. <br />Study Stores <br />There are nine Contractors' Warehouse stores in Southern California. Home Depot staff selected <br />two locations for inclusion in this parking study: the store in Montebello, California, and the store in <br />Pomona, California. These two stores were selected to be representative of the average customer <br />and parking activity for the nine stores. The Montebello store has about 75,600 square feet of space <br />and the Pomona store has 65,800 square feet. Table 1 summarizes the characteristics of each store. <br />Table 1- Summarv of Sttidv Store Characteristics <br />Characteristic Montebello Store Pomona Store <br />Address 7601 Telegraph Road <br />Montebello, CA 90640 1680 W. Mission Blvd. <br />Pomona, CA 91766 <br />Store Number 703 705 <br />Store Size 75,618 sq.ft. 65,367 sq.ft. <br />Total Transactions in 2004 216,311 209,521 <br />Average Daily Transactions in 2004 599 580 <br />Busiest Month in 2004 October October <br />Busiest Day of the Week in 2004 Saturday Saturday <br />Average Saturday Transactions in 2004 683 727 <br />Transactions on Busiest Day in 2004 879 881 <br />Busiest Day in 2004 Saturday, October 23 Saturday, October 16 <br />"d Busiest Day in 2004 Thursday, November 11 Saturday, October 23 <br />3`d Busiest Day in 2004 Friday, November 26 Saturday, November 6 <br />`h Busiest Day in 2004 Saturday, November 6 Saturday, May 22 <br />5`h Busiest Day in 2004 Saturday, January 3 Saturday, May 29 <br />Parking Spaces Available on Study Day 113 163 <br />Ludy Day Saturday, October 1, 2005 Saturday, October 8, 2005 <br />Design Day <br />The "design day" refers to the day of the year that experiences the maximum level of parking <br />activity that can be accommodated by the parking lot that will be built as a result of the design <br />methodology. Rather than a specific date of the year, the design day is defined by how much parking <br />activity takes place. In other words, the goal is to provide just enough parking spaces to <br />accommodate the demand on the selected design day, which could be the busiest day of the year, the <br />5`h busiest day, the 101h busiest day, etc., which could occur in different months for different stores. <br />Parking Study of Two Contractors Warehouse Stores - Final Report Page 3 <br />31A-.6139