3. PARKING STUDIES <br />The annual transaction data supplied by Contractors' Warehouse for 2004 showed that, for both <br />stores, the busiest day of the week was Saturday; the busiest month was October; and the busiest <br />consecutive 8 howl occurred from 8 AM to 4 PM. Therefore, parking demand studies were <br />conducted at the two study stores in October 2005, and both of the studies were conducted on a <br />Saturday between 8 AM and 4 PM. Each store was contacted prior to the study to ensure that no <br />unusual activities would be taking place at the store or in the parking lot on the day of the study. <br />Parking Lot Use <br />As shown in Table 1, 113 parking spaces were available for use at the Montebello store and 163 <br />spaces were available at the Pomona store. The "parking spaces available" represents the actual <br />number of parking spaces that were open for customer (and employee) parking on the day of the <br />study. In some cases, not all of the parking spaces constructed at a store are available to park in <br />because some may be taken "out of service" by the placement of sales displays, building materials, <br />and/or the temporary storage of equipment. The Montebello store did not have any parking spaces <br />taken out of service, but the Pomona store had a total of 22 spaces taken out of service by the storage <br />of bathtubs, rental equipment, and forklifts. Despite this, the Pomona store still had more parking <br />spaces available for customers than the Montebello store. In addition, it appeared the number of <br />spaces taken out of service appeared to be typical of the Pomona store's routine operations, most <br />likely due to the fact that the smaller Pomona store had more parking available to it. Detailed <br />surveys of each store's parking lot layout and use are presented in Appendix A. <br />At the top of each hour during the parking study, a complete inventory of the number of parking <br />spaces occupied in the store parking lot was taken. This inventory was taken on an aisle-by-aisle <br />basis so that a general spatial pattern of parking use could be determined as well as a numerical one. <br />In terms of numbers, neither of the Contractors' Warehouse store parking lots filled to capacity on <br />the study days. The Montebello store experienced a peak occupancy of 78% of the parking spaces <br />available for use, while the Pomona store experienced a peak occupancy of 61 %. This equates to an <br />average peak occupancy between the stores of 69%. The peak parking occupancy occurred at 2 PM <br />at the Montebello store and at 3 PM at the Pomona store (see Table 2). Spatially, several patterns of <br />parking lot use became apparent during the hourly parking inventory counts that warrant discussion. <br />These include customer and employee parking habits, lumberyard activity, and day laborer activity. <br />Of the two locations, the Pomona store has a more traditional retail store parking lot as it is located <br />in a shopping center in a generally suburban (retail/residential) area. As such, its parking lot <br />generally extends along the length of the warehouse and is well defined and landscaped. The <br />Montebello store is in an industrial area and has a less traditional parking lot, with most of the <br />parking concentrated in one corner of the property. Both stores have lumber yard parking areas that <br />operate differently from traditional parking areas. <br />Parking Study of Two COIM-act07 s Warehouse Stores --- Final Report Page 5 <br />31441