My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO - GRANT APP AND AA AWARD FROM AQMD-MSRC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
05/21/2012
>
55A - RESO - GRANT APP AND AA AWARD FROM AQMD-MSRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2012 10:31:24 AM
Creation date
5/17/2012 10:26:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
55A
Date
5/21/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MSRC Clean Transportation Funding" <br />2012 Local Government Match Program <br />PART D - PROJECT IMPLEMENTATION SCHEDULE <br />Electric Vehicle Charging Infrastructure <br />Please provide, either in the space outlined below or separate attached sheet, a Milestone Schedule for your proposed <br />Match Program project. The schedule should include anticipated start and completion dates for each task, activity, or <br />milestone identified in PART B, "Project Description/Statement of Work". <br />The format requirements for the Project Implementation Schedule are flexible. A template is provided below: <br />Implementation Schedule: Electric Vehicle Charging Infrastructure <br />PROJECT MILESTONE START DATE <br />1. Receive Executed Contract from AQMD ATP <br />2. Award Consultant Contract for Preliminary Engineering ATP + 1 <br /> and Project Design <br />3. Complete RFP and Solicit Bids ATP + 3 <br />4. Select Contractor(s) and Award Contract(s) ATP + 6 <br />5. Order Major Long Lead Time Equipment ATP + 9 <br />6. Submit Drawings/Specs for Permits ATP + 9 <br />7. Obtain Permits for Site Improvements ATP + 10 <br />8. Start Construction ATP + 13 <br />9. Complete Installation ATP + 13 <br />10. Conduct Training ATP + 15 <br />11. Implement Media and Community Outreach ATP + 15 <br />12. Complete Reporting ATP + 16 <br />9 <br />COMPLETION DATE <br />ATP <br />ATP+3 <br />ATP + 6 <br />ATP+8 <br />ATP + 10 <br />ATP+10 <br />ATP+12 <br />ATP+14 <br />ATP + 14 <br />ATP + 15 <br />ATP + 16 <br />ATP + 18 <br />55A-20
The URL can be used to link to this page
Your browser does not support the video tag.