Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> Work Plan <br /> Approach to completing task <br /> <br /> United has vast experience in deploying personnel and equipment within one hour response and <br /> <br /> understands how crucial it is to respond in a timely manner. United has over 64 technicians, 10 <br /> <br /> supervisors along with 12 vacuum trucks, I l vactor trucks, roll offs and end dumps that will be <br /> <br /> available if needed. Our personnel will quickly respond to various points and try to locate the <br /> <br /> source of any spill or discharge into the storm drain system and will try to isolate from entering <br /> <br /> Into waterways. <br /> <br /> United Storm Water is comprised of a team of dedicated individuals who are highly experienced in <br /> <br /> storm drain maintenance, fabrication and installation of catch basin inserts, AIRS units, CPS units, <br /> <br /> and working with government entities. Many of our employees have worked with our firm for over <br /> <br /> 10 years and along and will successfully plan, manage, and deliver professional, reliable, and <br /> <br /> innovative services for this project. <br /> <br /> United will provide all labor, equipment, materials necessary to perform both scheduled and as- <br /> <br /> needed inspection or cleaning of catch basins inserts according to IFB. United has capability of <br /> <br /> making any necessary repairs to the AIRS or CPS units in place. United will also respond to any <br /> <br /> emergency calls. All catch basins are inspected monthly during the storm season and cleaned as <br /> <br /> needed. Catch Basins are inspected after each major storm event and cleaned as needed.The <br /> <br /> work will also include as-needed "No Dumping" stenciling and the unlocking and locking of <br /> automatic retractable screen covers before and after the rain season. <br /> <br /> The work will be performed on all city own catch basins and be able to responding within one hour <br /> <br /> in case of an emergency as described in the scope of work of the IFB. An additional inserted <br /> <br /> catch basins may be added to this Contract at the sole discretion of the City. <br /> <br /> <br /> <br /> <br /> <br /> 25D-19 <br />