Laserfiche WebLink
<br /> <br /> <br /> Exhibit A <br /> <br /> SCOPE OF WORK <br /> Spill Response <br /> Under the direction of the City, the Contractor shall work to recover any discharge as defined in Santa Ana Municipal <br /> Code, Article IV: Water Pollution, and prevent progression into the public storm dram system and/or receiving waters. <br /> Contractor shall be capable of performing the following tasks: <br /> a. Deploy containment at various points along the projected travel path of the discharge and protect near-by storm <br /> drain facilities from contamination. The City shall provide a description of the site and discharge to the best of its <br /> ability during the initial request. The contractor shall respond within 1 hour of initial request. <br /> <br /> b. Deploy all necessary personnel, equipment and materials to recover the discharge. <br /> c. Conduct confined space entry and video camera inspection of storm drain facilities. <br /> <br /> d. Perform steam/pressure washing of the contaminated area, including storm drain facilities to the satisfaction of <br /> the City. <br /> e. Take discharge water samples for lab analysis and provide results to the City <br /> <br /> f. Provide routine pick-ups of contained pollutants throughout the City. <br /> <br /> g. Manifest the waste lawfully and efficiently to the satisfaction of the California Department of Toxic Substances <br /> Control (DTSC), the United States Department of Transportation, The Environmental Protection Agency and the <br /> EPA-permitted disposal facilities receiving the waste. <br /> h. Provide temporary storage, transport and proper legal disposal of recovered discharge. <br /> <br /> i. Provide an incident report with before and after pictures within 1 week of performing the work required pursuant to <br /> this contract and an annual report of all incidents within 2 weeks after the end of the City's fiscal year. The City <br /> shall provide sample formats for each report. <br /> j. Upon request, the Contractor shall submit supplemental proposals for Additional Work not called for under the <br /> Scope of Work of this contract. The Contractor must obtain written approval prior to commencing any Additional <br /> Work. <br /> k. Adhere to all the requirements of the City's NPDES Permit while performing the work required pursuant to this <br /> contract. <br /> <br /> Storm Drain Facility Cleaning <br /> Under the direction of the City, the Contractor shall inspect and clean storm drain facilities within the City. <br /> <br /> Contractor shall be capable of performing the following tasks: <br /> <br /> a. Perform thorough inspection of all Catch Basins throughout the City and provide an inspection schedule within 7 <br /> days of Notice to Proceed. <br /> Remove the existing manhole cover and reinstall and fasten the manhole cover whenever unattended. The <br /> replacement of missing or damaged screws or bolts shall be at no additional cost and should be noted on the <br /> Inspection Report. <br /> During Storm Season, Perform thorough inspection of all Catch Basin with Inserts throughout the City within the <br /> first 7 days of each Storm Season month. <br /> <br /> b. During each inspection, remove all trash and debris found in front of curb opening or on ARS Insert and all <br /> vegetation growing across and/or blocking the opening. <br /> 7 <br /> <br /> 25D-34 <br />