My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - STORM DRAIN CLEANING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
06/04/2012
>
25D - AGMT - STORM DRAIN CLEANING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2012 9:01:07 AM
Creation date
5/31/2012 4:12:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
6/4/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> All vehicles used during the catch basin inspection and cleaning process will be equipped with <br /> <br /> traffic control lights, traffic cones and traffic delineators for worker safety and limit traffic <br /> <br /> delays. <br /> <br /> <br /> Ocean blue will submit a traffic control plan compliant with the Department of Transportation to <br /> <br /> the City of Santa Ana prior to the commencement of any work performed. <br /> <br /> <br /> Ocean Blue will be able to perform the inspections of all catch basins with in a seven day notice <br /> <br /> to proceed from the City if Santa Ana. <br /> <br /> During the removal of existing manhole covers Ocean Blue will inspect rings and cover lids for <br /> <br /> cracks and defects. Ocean Blue will replace any missing or damaged screws or bolts at no <br /> <br /> additional cost to the city of Santa Ana. <br /> <br /> <br /> During the inspection process Ocean Blue will log and photo the condition of each catch basin <br /> <br /> inside and outside prior to any work. <br /> <br /> <br /> After photographing the condition of each catch basin Ocean blue will remove all trash and <br /> <br /> debris found in front of curb opening or on ARS Inserts. <br /> <br /> Ocean Blue will remove all vegetation growing across and or blocking the opening. <br /> <br /> <br /> Ocean Blue will provide a detailed report that describes the physical condition of each catch <br /> <br /> basin. <br /> <br /> <br /> Items included in the inspection report for each catch basin will include the following. <br /> <br /> • Photos of the catch basin before cleaning / inspection and after cleaning <br /> <br /> • Date of inspection <br /> <br /> <br /> 2 <br /> <br /> 25D-38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.