Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> approval from Park Services prior to exceeding the monthly <br /> irrigation budget as detailed in the Monthly Water Conservation <br /> Report Estimated Applied Water (EAW) requirements. Failure <br /> to get approval from Park Services prior to exceeding the <br /> monthly irrigation budget will result in the Contractor paying for <br /> the excess water. <br /> (5) When an irrigation system does not adequately provide <br /> water to the turf area in which it is installed, due to any reason <br /> including but not limited to controller failure, valve failure, <br /> broken heads, poor system design, etc., the Contractor shall <br /> provide supplemental irrigation at no extra cost to the City. The <br /> Contractor may use any reasonable means necessary to <br /> uniformly irrigate turf areas. Contractor may also submit AEWs <br /> with engineered drawings to improve these areas of the system. <br /> (6) Automatic irrigation shall be conducted between the hours of <br /> 10:00 p.m. and 4:00 a.m. and shall be programmed not to exceed <br /> the EAW. In the event that Contractors water consumption <br /> exceeds the EAW City may deduct said overages from the <br /> Contractor's monthly invoice. <br /> <br /> (7) Contractor shall ensure that all staff working on irrigation <br /> possess one of the following certifications: <br /> a. Fullerton College Certificate of Proficiency in Landscape <br /> Irrigation <br /> b. UC Riverside Certificate in Landscape Irrigation <br /> c. Irrigator Tech Certificate Program (must possess all of the <br /> following): <br /> i. Certified Irrigation Repair Technician (GIRT) <br /> ii. Certified Irrigation Auditor (CIA) <br /> iii. Smart Water Certified (SWC) <br /> iv. Certified Irrigation Installer (CII) <br /> Note: If Contractor staff has not received certification <br /> before March 1, 2013, Contractor shall contract with one <br /> of the City's pre-qualified irrigation firms for all <br /> irrigation work, including weekly visual inspections, <br /> monthly reports and repairs. <br /> (8) From time to time City staff will advise contractor of special <br /> events occurring in contract areas and contractor will be required <br /> to adjust irrigation scheduling to avoid negatively impacting the <br /> event. Should the contractor fail to properly adjust irrigation or <br /> otherwise prepare the area for the special event, a failure to <br /> perform in the amount of $916 will be assessed for liquidated <br /> damages. <br /> <br /> <br /> <br /> <br /> 16 <br /> 251-26 <br />