Laserfiche WebLink
Orange County Center for Arts), and numerous schools. The project will fully meet the <br />synchronization needs for the corridor for 3 years and no other requests for funding will <br />be initiated during the maintenance and operation phase. Communication system <br />improvements that directly benefit signal synchronization along the corridor will also be <br />included. <br />The Fairview Signal synchronization project accomplishes the goals of synchronizing <br />signals across jurisdictions, through a 4-year initially funded timeframe to improve <br />existing traffic patterns. The end result will be a field-implemented synchronized timed <br />route, achieved through design and engineering, construction and installation of field <br />controllers and maintenance and monitoring to ensure continuous improvement of the <br />system. <br />Proiect Plan and Schedule <br />To verify and monitor the improvements before and after studies will be initiated using <br />travel times, average speeds, average stops per mile and vehicle emissions. The <br />improvements will occur within existing facilities so there is no anticipated delay for <br />construction and the project will pursue a timely use of funds. <br />Data counts will comply with OCTA digital format requirements. Jamar or <br />NDS/Southland car count format and include Synchro version 6 compatible information <br />consistent with the OCTA ROADS data base. <br />The project management will follow CTFP Guidelines for reimbursements and reporting, <br />including a work schedule with implementation and maintenance operation phases <br />included. <br />Scope of Work <br />Design, This task, to be complete in FY 2011-2012, consists of confirming the survey of <br />equipment, preparation of drawings and schematics for cabinet work, fiber <br />optic/communication work, CCTV camera installations and other miscellaneous devices <br />and equipment design as necessary. During this time the before studies and <br />documentation will be completed. <br />Right-of-Way, No right-of-way is needed for this project. <br />Construction, Construction is schedule for late in the FY2011-2012 fiscal year. The <br />scope of construction work includes: <br />Utility Coordination <br />Traffic Signal Controllers and equipment for synchronization (including CCTV) <br />Communication Devices and Cabling including interconnects and switches <br />Traffic Cabinets, where needed for synchronization <br />Maintenance and Monitoring of the Traffic Signal Synchronization for 4 years. <br />25G-20