My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT - FAIRVIEW TAFFIC SIGNAL SYNC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
07/02/2012
>
25G - AGMT - FAIRVIEW TAFFIC SIGNAL SYNC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2012 3:05:36 PM
Creation date
6/28/2012 3:05:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
7/2/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Fee Schedule <br />Part 1-Signal Coordination, Assessments, Lump Sum $ 159,609 <br />Modeling, Before and After Studies, Reports <br />And Documents for OCTA reporting <br />Part 2-Work for Costa Mesa Intersections Lump Sum $ 262,525 <br />Part 3-Work for Santa Ana Intersections Lump Sum $_ 162,215 <br />Part 4-Preparation of Record drawings, or Project Plans Lump Sum $ 29,989 <br />Specifications and Estimate or Procurement documents <br />Part 5-3 Years follow-up Maintenance Per Year $ 14,700 Sub-Total $_ 44,100 <br />CUMULATIVE NOT-TO-EXCEED FEE: $ 658,438 <br />Additive Work Scope <br />Traffic Counts at Intersections Per Intersection $ 413.00 Total $12,803 <br />Install 3" Conduit <br />Per Lineal Foot $ 30.00 Total $_ 36,000 <br />Additive work shall be included exclusively at the discretion of the City contingent on bid results. <br />Please include an estimated work breakdown structure for the project and personnel rate sheet. The <br />Evaluation recognizes that costs may vary based upon project approach so work breakdown structure <br />Information should support fee submissions. <br />All originals of plans, field notes, data and calculations, correspondence, reports, electronic files, <br />etc., will be turned over to the City upon completion of work. Ten percent (10%) of the total <br />contract fee will be withheld until final project documents are submitted to the City. <br />25G-33
The URL can be used to link to this page
Your browser does not support the video tag.