My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (4)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:59:48 PM
Creation date
7/2/2012 11:14:13 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
6/18/2012
Expiration Date
6/14/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />Kevin O'Rourke <br />,.ro: Interim City Manager <br />Raul Godinez II, Executive Director <br />From: Public Works Agency <br />30 <br />Date: June 14, 2013 <br />Project Nos. 10-6704, 10-6705 and 12-6763 <br />Traffic Signal Installation on Civic Center Dr. & Pacific St.; Traffic Signal <br />Installation on 17th/King St. and Bristol St. Bike Lane Extension from Edinger to <br />McFadden Avenues -[Federal Project HSIPL-5063(130) and HSIPL-5063(129)] <br />Subject: Change Order No. 1 <br />Contractor: California Professional Engineering <br />929 Otterbein Avenue, Unit E <br />La Puente, CA 91748 <br />Project Description: Traffic Signal Installations and Bike Lane Extension <br />Change Order Number: 1 Total This Change Order $ 12,487.50 <br />Accounting Unit-Activity Number: 05917660-10670503028 <br />JUSTIFICATION <br />The project includes the installation of two new traffic signals at the intersections of <br />Seventeenth/King Streets and Civic Center Drive/Pacific Street and to stripe a bike lane <br />along Bristol Street between McFadden and Edinger Avenues. A contract was awarded to <br />California Professional Engineering, Inc. on June 18, 2012 for the improvements which <br />include: new traffic signal poles, conduit, street lights, traffic loops, and striping. <br />To enhance pedestrian and motorist safety, a new traffic signal was installed at the <br />intersection of 17th and King Streets. However, due to the close proximity of the existing <br />traffic signal on 17th and English Streets with the new traffic signal on 17th and King Streets, <br />motorists approaching one intersection could confuse the signal light with the adjacent <br />intersection. <br />Therefore, the Traffic Engineering section recommended replacing the heads with <br />programmable vehicle light emitting diodes heads which appear off until motorists approach <br />the next intersection in order avoid this potential hazard per PCO No 2 dated 03/21/2013. <br />AGREED COSTS 12,487.50
The URL can be used to link to this page
Your browser does not support the video tag.